PLM, BOM & Digital Thread calculator
CAD to ERP Sync Savings Calculator
Find what an integration between CAD or PLM and ERP saves each year after its fee. You need the records synced, the cost to re-key one by hand, the share of re-keying avoided and the platform fee.
What this calculator does
- Yearly savings from syncing part records from CAD or PLM into ERP, net of the integration platform fee, per record synced.
Formula used
- Re-keying cost avoided ($) = part records synced per year × manual re-keying cost per record × re-keying avoided ÷ 100
- Net annual sync savings ($) = re-keying cost avoided − integration platform annual fee
- Net savings per record synced = net annual sync savings ÷ part records synced per year
Inputs explained
- Part Records Synced per Year: Records passed from CAD or PLM to ERP each year.
- Manual Re-Keying Cost per Record: Cost to key one record into ERP by hand, including fixing errors.
- Re-Keying Avoided by Sync: Share of manual entry and its errors the sync removes.
- Integration Platform Annual Fee: Yearly cost of the integration platform.
How to use the result
- Best suited to justifying an integration platform renewal, comparing a point integration with a platform.
- Does not value faster availability of data in ERP. Ignores the integration's implementation cost.
Common questions
- What is the re-keying cost per record? The time to enter one part record into ERP by hand plus the time spent finding and fixing the typing errors that entry creates.
- Why is the share avoided below 100%? Some fields still need a human: costing, planner codes or supplier data the sync does not carry. Measure which records are still touched.
- What if the fee exceeds the savings? The calculator warns. Either sync more record types through the same platform or renegotiate the fee.
- Does the result include implementation? No. The one-time cost of building the integration is weighed in the PLM ROI calculator.
Last reviewed 2026-10-28.