Roofing, Siding & Exterior Building Products calculator
Freight Cube Utilization Calculator
Find how much of the trailer's usable cube a planned load of bundles fills, and whether weight or cube runs out first. You need the bundle count, volume and weight per bundle, trailer cube, payload limit and your target.
What this calculator does
- Share of a trailer's usable cube a roofing or siding load fills, and whether it weighs out before reaching your cube target.
Formula used
- Cube utilization = bundles × cube per bundle ÷ trailer usable cube × 100; empty cube = usable cube − bundles × cube per bundle
- Weight utilization = bundles × weight per bundle ÷ legal payload limit × 100
- Bundles to add = CEILING(target cube fill × usable cube ÷ (100 × cube per bundle)) − bundles, minimum zero
- Bundle limit by weight = FLOOR(legal payload limit ÷ weight per bundle)
- Gap to target = target cube fill − cube utilization
Inputs explained
- Bundles or Pallets on the Load: Count from the load plan or bill of lading.
- Cube per Bundle: Bundle length × width × height from the packing spec, in feet.
- Weight per Bundle: Shipping weight including dunnage, from the packing spec or a scale ticket.
- Trailer Usable Cube: Inside length × width × height of the trailer, from its spec.
- Legal Payload Limit: 80,000 lb gross limit minus tractor and empty trailer weight.
- Target Cube Fill: Share of usable cube your freight plan expects each load to fill.
How to use the result
- Best suited to building a siding load before dispatch, comparing bundle sizes for trailer fit, checking whether a mixed load weighs out.
- Does not check whether bundles physically fit the floor plan, door opening or stacking limits. Axle weight limits and the bridge formula can cap payload below the gross limit; check axle weights separately.
Current U.S. benchmarks
- U.S. housing starts run at 1,309k per year (Census, Oct 2026), up 2.8% from a year earlier, the demand driver for building products.
Common questions
- What usable cube should I enter for a 53 ft dry van? Use your trailer's inside dimensions; one trailer supplier puts a 53 ft dry van at about 3,800 to 4,000 cu ft usable. Wall construction changes it, so check your trailer's spec.
- Why does a siding load cube out before it weighs out? Because its bundles weigh less per cubic foot than payload ÷ usable cube: 9.3 against 11.6 lb per cu ft at the defaults. Denser bundles, such as stacked steel panels, can reverse that and weigh out first.
- How should I measure cube per bundle for nested panels? Measure the packed outside envelope: length × width × height, including dunnage and any pallet. Nesting panels lowers the stack height, so each bundle takes less cube.
- Is a 100% cube fill target realistic? Rarely, because bundles leave gaps at the walls, nose and doors, which this page counts as empty cube. Set the target from loads your team actually builds.
Last reviewed 2026-10-28.