Installer Kit Quantity Calculator
Find how many complete installer kits of clips, fasteners, flashing and sealant a kitting run will deliver, and whether that covers the order. You need kits per cycle, available cycles, uptime, first-pass yield and kits ordered.
What this calculator does
- Good installer kits a kitting run will deliver after downtime and first-pass failures, and whether that covers the order.
Formula used
- Gross kits = kits per cycle × available cycles
- Kits lost to downtime = gross kits × (1 − uptime ÷ 100)
- Kits failing first-pass check = gross kits × uptime ÷ 100 × (1 − first-pass yield ÷ 100)
- Good kits = gross kits × uptime ÷ 100 × first-pass yield ÷ 100; shortfall = kits needed − good kits, floored at zero
- Cycles to schedule = kits needed ÷ (kits per cycle × uptime ÷ 100 × first-pass yield ÷ 100)
Inputs explained
- Kits Assembled per Production Cycle: Complete kits the kitting station finishes each cycle.
- Available Assembly Cycles: Scheduled run time divided by station cycle time, before downtime.
- Assembly Line Uptime: Run time divided by scheduled time, from the downtime log.
- Kit First-Pass Yield: Kits passing the count and component check without rework.
- Kits Needed for the Order: Kits on the distributor order or this run's build plan.
How to use the result
- Best suited to promising a kit quantity to a distributor, sizing a kitting shift for a large order, weighing an uptime fix against a yield fix.
- Reworked kits are not added back; count them separately if rework returns them the same shift. Component shortages are not checked; a missing clip stops kits even at full uptime.
Current U.S. benchmarks
- U.S. housing starts run at 1,309k per year (Census, Oct 2026), up 2.8% from a year earlier, the demand driver for building products.
Common questions
- Why is good kit output lower than kits per cycle times cycles? Because downtime removes cycles and the first-pass check removes kits. At 90% uptime and 97% yield, 1,920 gross kits become about 1,676 good kits, with 192 lost to downtime and about 52 to failed checks.
- Where do I get assembly line uptime for the kitting station? Divide the minutes the station actually ran by the minutes it was scheduled, from your downtime log or OEE report. Exclude planned breaks from both if your available cycles already exclude them.
- Does a reworked kit count toward first-pass yield? No. First-pass yield counts only kits that pass the count and component check without rework. If your rework loop returns kits to good stock the same shift, add them to the output yourself.
- How many cycles should I schedule to fill the order? Divide kits needed by the good kits each scheduled cycle yields: kits per cycle times uptime times first-pass yield. For 1,700 kits at 4 per cycle, 90% uptime and 97% yield, schedule about 487 cycles.