Roofing, Siding & Exterior Building Products calculator
Roll Forming Throughput Calculator
Find how many good panels a stop-to-cut roll former turns out in a scheduled run, and where the rest go. You need panel length, line speed, cutoff stop time, run hours, uptime and first-pass yield.
What this calculator does
- Good panels per run and per hour from panel length, line speed, cutoff stops, uptime and first-pass yield.
Formula used
- Panel cycle time (s) = panel length ÷ line speed × 60 + cutoff stop time
- Gross panels = scheduled hours × 3,600 ÷ panel cycle time
- Good panels = gross panels × uptime ÷ 100 × first-pass yield ÷ 100; per hour = good ÷ scheduled hours
- Downtime loss = gross × (1 − uptime ÷ 100); reject loss = gross × uptime ÷ 100 × (1 − first-pass yield ÷ 100)
- Cutoff stop share = cutoff stop time ÷ panel cycle time × 100
Inputs explained
- Panel Length: Cut length from the order; average length for a mixed cut list.
- Forming Line Speed: Running speed set on the roll former for this profile.
- Cutoff Stop Time per Panel: Cut-to-cut stopwatch seconds minus panel length ÷ line speed × 60.
- Scheduled Run Time: Hours the production plan gives this run.
- Expected Roll-Former Uptime: Share of scheduled time running, net of coil changes and jams.
- Expected Panel First-Pass Yield: Accepted panels ÷ panels formed, from reject logs.
How to use the result
- Best suited to promising panel counts before scheduling a roofing order, weighing a flying cutoff against a stopping shear.
- Does not check that the profile, gauge or punching pattern can run at the entered speed. Stacking, bundling and runout table limits are not modeled and can cap output lower.
Current U.S. benchmarks
- U.S. housing starts run at 1,309k per year (Census, Oct 2026), up 2.8% from a year earlier, the demand driver for building products.
Common questions
- Why do short panels lose so much time to cutoff stops? Every cut costs the same stop, so short panels spend more of each cycle standing still. At 60 ft / min with a 6 s stop, 16 ft panels stop for 27% of each cycle and 8 ft panels for 43%.
- How do I model a flying cutoff? Enter a cutoff stop time of zero. The shear travels with the strip, so the cycle is forming time alone and the default run rises from about 1,309 to 1,800 gross panels.
- Do coil changes belong in uptime or cutoff stop time? Uptime. Cutoff stop time is the dwell repeated at every cut, while coil changes, splices, jams and profile changeovers are occasional stops measured over several shifts.
- How do I measure the cutoff stop time? Time several panels cut to cut, average them, and subtract the forming time, panel length ÷ line speed × 60. What remains is the slowdown, shear stroke and restart each cut adds.
Last reviewed 2026-10-28.