Roofing, Siding & Exterior Building Products calculator
Packaging Length Optimization Calculator
Find how much film an orbital wrapper draws from the roll to wrap one panel bundle. You need bundle length and girth, film band width, overlap, pre-stretch and application efficiency.
What this calculator does
- Roll film drawn per wrapped panel bundle from bundle size, overlap, pre-stretch and wrapping line application efficiency.
Formula used
- Wraps per bundle = bundle length × 12 ÷ (film band width × (1 − overlap ÷ 100)); film layers = 1 ÷ (1 − overlap ÷ 100)
- Stretched film on the bundle (ft) = wraps per bundle × bundle girth ÷ 12
- Roll film per bundle = stretched film ÷ (1 + pre-stretch ÷ 100) ÷ (application efficiency ÷ 100)
- Film lost per bundle = roll film per bundle − stretched film ÷ (1 + pre-stretch ÷ 100)
- Roll film saved by pre-stretch = stretched film ÷ (application efficiency ÷ 100) − roll film per bundle
Inputs explained
- Bundle Length: Panel length in the bundle, from the cut list.
- Bundle Girth: Distance around the bundle cross section, measured with a tape.
- Film Band Width: Width of the film band as applied, measured on a wrapped bundle.
- Wrap Overlap: Share of each film band laid over the previous wrap.
- Pre-Stretch: Powered pre-stretch setting; 200% turns 1 ft of film into 3 ft.
- Wrapping Line Application Efficiency: Theoretical roll film ÷ roll film actually used per bundle.
How to use the result
- Best suited to sizing a film order for a bundling run, comparing overlap and pre-stretch settings before a trial.
- Extra wraps held at the bundle ends are not counted, so roll film per bundle runs low. Does not check containment force, film gauge or whether the overlap holds the bundle in transit.
Current U.S. benchmarks
- U.S. housing starts run at 1,309k per year (Census, Oct 2026), up 2.8% from a year earlier, the demand driver for building products.
Common questions
- My wrapper is rated one in, three out. What pre-stretch do I enter? Enter 200%. Pre-stretch is the added length: 1 ft of roll film leaving as 3 ft is 200%. For a ratio such as 3:1, subtract 1 and multiply by 100. Some guides call doubling 200%, so check the in and out rating.
- Why measure the film band on the bundle, not the roll? Stretched film necks down, so the band on the bundle is narrower than the roll. Using roll width overstates how far each wrap advances and undercounts wraps and film.
- How much film does extra overlap cost? Film use scales with 1 ÷ (1 − overlap). Raising overlap from 50% to 60% lifts layers from 2 to 2.5 and film per bundle by 25%, so add overlap only where the load needs it.
- How do I measure application efficiency? Run this page at 100% for the theoretical roll film per bundle, then divide that by the actual roll footage per bundle. Count bundles wrapped from a roll of known length.
Last reviewed 2026-10-28.