MFG Calcs

Send a calculator request, bug, or feature idea.

Contact MFG Calcs with calculator requests, bug reports, feedback, or feature ideas.

About this page

  • Use this page to request a calculator that does not exist yet, report a formula error, suggest a correction, or ask about the library. MFG Calcs is run by one person, who reads every calculator request and error report.
  • When a reported error is confirmed, the formula is fixed and an automated test is added that locks in the correct behavior, so the test suite fails if a later edit brings the same mistake back. Corrections are treated as a normal part of maintaining a reference.
  • For sponsorship of a calculator category or a single calculator, choose the Advertising topic; rates, placements, and the sponsorship policy are on the advertising page.

Last reviewed 2026-07-13.