Pressure converter
Convert Bar to Megapascals (bar to MPa)
1 bar = 0.1 MPa. Injection and hydraulic pressures at higher ranges.
Bar to megapascals conversion table
| bar | MPa |
|---|---|
| 1 bar | 0.1 MPa |
| 2 bar | 0.2 MPa |
| 3 bar | 0.3 MPa |
| 4 bar | 0.4 MPa |
| 5 bar | 0.5 MPa |
| 6 bar | 0.6 MPa |
| 7 bar | 0.7 MPa |
| 8 bar | 0.8 MPa |
| 9 bar | 0.9 MPa |
| 10 bar | 1 MPa |
| 15 bar | 1.5 MPa |
| 20 bar | 2 MPa |
| 25 bar | 2.5 MPa |
| 30 bar | 3 MPa |
| 40 bar | 4 MPa |
| 50 bar | 5 MPa |
| 75 bar | 7.5 MPa |
| 100 bar | 10 MPa |
| 150 bar | 15 MPa |
| 200 bar | 20 MPa |
| 250 bar | 25 MPa |
| 500 bar | 50 MPa |
| 1000 bar | 100 MPa |
How to convert bar to megapascals
Multiply the value in bar by 0.1 to get megapascals. 1 bar equals 0.1 MPa, and 1 MPa equals 10 bar.
About these units
The bar is a metric pressure unit equal to 100 kilopascals, close to one atmosphere. European pneumatic and hydraulic equipment is rated in bar.
The megapascal equals one million pascals, or one newton per square millimeter. Material strengths such as yield and tensile are published in megapascals.
Common questions
How many megapascals are in a bar?
1 bar equals 0.1 MPa.
How do you convert bar to megapascals?
Use MPa = bar ÷ 10. So 1 bar = 0.1 MPa, and to go back, 1 MPa = 10 bar.
What is 10 bar in MPa?
10 bar equals 1 MPa.
What is 100 bar in MPa?
100 bar equals 10 MPa.