Pressure converter

Convert Megapascals to Bar (MPa to bar)

1 MPa = 10 bar. Injection and hydraulic pressures at higher ranges.

Megapascals to bar conversion table

MPabar
1 MPa10 bar
2 MPa20 bar
3 MPa30 bar
4 MPa40 bar
5 MPa50 bar
6 MPa60 bar
7 MPa70 bar
8 MPa80 bar
9 MPa90 bar
10 MPa100 bar
15 MPa150 bar
20 MPa200 bar
25 MPa250 bar
30 MPa300 bar
40 MPa400 bar
50 MPa500 bar
75 MPa750 bar
100 MPa1000 bar
150 MPa1500 bar
200 MPa2000 bar
250 MPa2500 bar
500 MPa5000 bar
1000 MPa10000 bar

How to convert megapascals to bar

Multiply the value in megapascals by 10 to get bar. 1 MPa equals 10 bar, and 1 bar equals 0.1 MPa.

About these units

The megapascal equals one million pascals, or one newton per square millimeter. Material strengths such as yield and tensile are published in megapascals.

The bar is a metric pressure unit equal to 100 kilopascals, close to one atmosphere. European pneumatic and hydraulic equipment is rated in bar.

Common questions

How many bar are in a megapascal?

1 MPa equals 10 bar.

How do you convert megapascals to bar?

Use bar = MPa × 10. So 1 MPa = 10 bar, and to go back, 1 bar = 0.1 MPa.

What is 10 MPa in bar?

10 MPa equals 100 bar.

What is 100 MPa in bar?

100 MPa equals 1000 bar.

Convert bar to MPa or browse all converters.

Download this conversion table as CSV.