Pressure converter

Convert Bar to Psi (bar to psi)

1 bar = 14.5038 psi. Hydraulics, pneumatics, and molding cavity pressure.

Bar to psi conversion table

barpsi
1 bar14.5038 psi
2 bar29.0075 psi
3 bar43.5113 psi
4 bar58.0151 psi
5 bar72.5189 psi
6 bar87.0226 psi
7 bar101.526 psi
8 bar116.03 psi
9 bar130.534 psi
10 bar145.038 psi
15 bar217.557 psi
20 bar290.075 psi
25 bar362.594 psi
30 bar435.113 psi
40 bar580.151 psi
50 bar725.189 psi
75 bar1087.78 psi
100 bar1450.38 psi
150 bar2175.57 psi
200 bar2900.75 psi
250 bar3625.94 psi
300 bar4351.13 psi
500 bar7251.89 psi
1000 bar14503.77 psi

How to convert bar to psi

Multiply the value in bar by 14.5038 to get psi. 1 bar equals 14.5038 psi, and 1 psi equals 0.068948 bar.

About these units

The bar is a metric pressure unit equal to 100 kilopascals, close to one atmosphere. European pneumatic and hydraulic equipment is rated in bar.

Pounds per square inch is the standard US pressure unit for compressed air, hydraulics, and tire and vessel ratings. Shop air systems typically run 90 to 125 psi.

Common questions

How many psi are in a bar?

1 bar equals 14.5038 psi.

How do you convert bar to psi?

Use psi ≈ bar × 14.5038. So 1 bar = 14.5038 psi, and to go back, 1 psi = 0.068948 bar.

What is 10 bar in psi?

10 bar equals 145.038 psi.

What is 100 bar in psi?

100 bar equals 1450.38 psi.

Convert psi to bar or browse all converters.

Download this conversion table as CSV.