Pressure converter

Convert Psi to Bar (psi to bar)

1 psi = 0.068948 bar. Hydraulics, pneumatics, and molding cavity pressure.

Psi to bar conversion table

psibar
1 psi0.068948 bar
2 psi0.137895 bar
3 psi0.206843 bar
4 psi0.27579 bar
5 psi0.344738 bar
6 psi0.413685 bar
7 psi0.482633 bar
8 psi0.551581 bar
9 psi0.620528 bar
10 psi0.689476 bar
15 psi1.0342 bar
20 psi1.379 bar
25 psi1.7237 bar
30 psi2.0684 bar
40 psi2.7579 bar
50 psi3.4474 bar
75 psi5.1711 bar
100 psi6.8948 bar
150 psi10.3421 bar
200 psi13.7895 bar
250 psi17.2369 bar
300 psi20.6843 bar
500 psi34.4738 bar
1000 psi68.9476 bar

How to convert psi to bar

Multiply the value in psi by 0.068948 to get bar. 1 psi equals 0.068948 bar, and 1 bar equals 14.5038 psi.

About these units

Pounds per square inch is the standard US pressure unit for compressed air, hydraulics, and tire and vessel ratings. Shop air systems typically run 90 to 125 psi.

The bar is a metric pressure unit equal to 100 kilopascals, close to one atmosphere. European pneumatic and hydraulic equipment is rated in bar.

Common questions

How many bar are in a psi?

1 psi equals 0.068948 bar.

How do you convert psi to bar?

Use bar ≈ psi × 0.0689476. So 1 psi = 0.068948 bar, and to go back, 1 bar = 14.5038 psi.

What is 10 psi in bar?

10 psi equals 0.689476 bar.

What is 100 psi in bar?

100 psi equals 6.8948 bar.

Convert bar to psi or browse all converters.

Download this conversion table as CSV.