Temperature converter

Convert Celsius to Kelvin (C to K)

1 C = 274.15 K. Absolute temperature for thermodynamic calculations.

Celsius to Kelvin conversion table

CK
0 C273.15 K
20 C293.15 K
100 C373.15 K
200 C473.15 K
300 C573.15 K
500 C773.15 K
1000 C1273.15 K

How to convert Celsius to Kelvin

Temperature conversion uses a formula: K = C + 273.15. 1 C equals 274.15 K, and 1 K equals -272.15 C.

About these units

The Celsius scale sets water freezing at 0 and boiling at 100 degrees at standard pressure. Process, mold, and oven temperatures worldwide are set in Celsius.

The kelvin is the SI absolute temperature unit, starting at absolute zero. Thermodynamic and gas-law calculations require temperatures in kelvin.

Common questions

What is 100 C in K?

100 C equals 373.15 K, using K = C + 273.15.

How do you convert Celsius to Kelvin?

Use K = C + 273.15. Temperature scales start from different zero points, so no single multiplier converts them; the formula includes an offset.

Convert K to C or browse all converters.

Download this conversion table as CSV.