Temperature converter

Convert Kelvin to Celsius (K to C)

1 K = -272.15 C. Absolute temperature for thermodynamic calculations.

Kelvin to Celsius conversion table

KC
273 K-0.15 C
293 K19.85 C
373 K99.85 C
473 K199.85 C
573 K299.85 C
773 K499.85 C
1273 K999.85 C

How to convert Kelvin to Celsius

Temperature conversion uses a formula: C = K − 273.15. 1 K equals -272.15 C, and 1 C equals 274.15 K.

About these units

The kelvin is the SI absolute temperature unit, starting at absolute zero. Thermodynamic and gas-law calculations require temperatures in kelvin.

The Celsius scale sets water freezing at 0 and boiling at 100 degrees at standard pressure. Process, mold, and oven temperatures worldwide are set in Celsius.

Common questions

What is 373 K in C?

373 K equals 99.85 C, using C = K − 273.15.

How do you convert Kelvin to Celsius?

Use C = K − 273.15. Temperature scales start from different zero points, so no single multiplier converts them; the formula includes an offset.

Convert C to K or browse all converters.

Download this conversion table as CSV.