Volume converter

Convert Cubic Feet to Cubic Meters (ft3 to m3)

1 ft3 = 0.028317 m3. Compressed air, dust collection, and bulk volume.

Cubic feet to cubic meters conversion table

ft3m3
1 ft30.028317 m3
2 ft30.056634 m3
3 ft30.084951 m3
4 ft30.113267 m3
5 ft30.141584 m3
6 ft30.169901 m3
7 ft30.198218 m3
8 ft30.226535 m3
9 ft30.254852 m3
10 ft30.283168 m3
15 ft30.424753 m3
20 ft30.566337 m3
25 ft30.707921 m3
30 ft30.849505 m3
40 ft31.1327 m3
50 ft31.4158 m3
75 ft32.1238 m3
100 ft32.8317 m3
150 ft34.2475 m3
200 ft35.6634 m3
250 ft37.0792 m3
500 ft314.1584 m3
1000 ft328.3168 m3

How to convert cubic feet to cubic meters

Multiply the value in cubic feet by 0.028317 to get cubic meters. 1 ft3 equals 0.028317 m3, and 1 m3 equals 35.3147 ft3.

About these units

The cubic foot is the US volume unit for compressed air receivers, gas cylinders, and freight volume. One cubic meter is about 35.3 cubic feet.

The cubic meter is the SI volume unit, equal to 1,000 liters. Bulk liquids, gases, and dust-collection airflow totals are measured in cubic meters.

Common questions

How many cubic meters are in a cubic foot?

1 ft3 equals 0.028317 m3.

How do you convert cubic feet to cubic meters?

Use m3 ≈ ft3 × 0.0283168. So 1 ft3 = 0.028317 m3, and to go back, 1 m3 = 35.3147 ft3.

What is 10 ft3 in m3?

10 ft3 equals 0.283168 m3.

What is 100 ft3 in m3?

100 ft3 equals 2.8317 m3.

Convert m3 to ft3 or browse all converters.

Download this conversion table as CSV.