Volume converter
Convert Cubic Meters to Cubic Feet (m3 to ft3)
1 m3 = 35.3147 ft3. Compressed air, dust collection, and bulk volume.
Cubic meters to cubic feet conversion table
| m3 | ft3 |
|---|---|
| 1 m3 | 35.3147 ft3 |
| 2 m3 | 70.6293 ft3 |
| 3 m3 | 105.944 ft3 |
| 4 m3 | 141.259 ft3 |
| 5 m3 | 176.573 ft3 |
| 6 m3 | 211.888 ft3 |
| 7 m3 | 247.203 ft3 |
| 8 m3 | 282.517 ft3 |
| 9 m3 | 317.832 ft3 |
| 10 m3 | 353.147 ft3 |
| 15 m3 | 529.72 ft3 |
| 20 m3 | 706.293 ft3 |
| 25 m3 | 882.867 ft3 |
| 30 m3 | 1059.44 ft3 |
| 40 m3 | 1412.59 ft3 |
| 50 m3 | 1765.73 ft3 |
| 75 m3 | 2648.6 ft3 |
| 100 m3 | 3531.47 ft3 |
| 150 m3 | 5297.2 ft3 |
| 200 m3 | 7062.93 ft3 |
| 250 m3 | 8828.67 ft3 |
| 500 m3 | 17657.33 ft3 |
| 1000 m3 | 35314.67 ft3 |
How to convert cubic meters to cubic feet
Multiply the value in cubic meters by 35.3147 to get cubic feet. 1 m3 equals 35.3147 ft3, and 1 ft3 equals 0.028317 m3.
About these units
The cubic meter is the SI volume unit, equal to 1,000 liters. Bulk liquids, gases, and dust-collection airflow totals are measured in cubic meters.
The cubic foot is the US volume unit for compressed air receivers, gas cylinders, and freight volume. One cubic meter is about 35.3 cubic feet.
Common questions
How many cubic feet are in a cubic meter?
1 m3 equals 35.3147 ft3.
How do you convert cubic meters to cubic feet?
Use ft3 ≈ m3 × 35.3147. So 1 m3 = 35.3147 ft3, and to go back, 1 ft3 = 0.028317 m3.
What is 10 m3 in ft3?
10 m3 equals 353.147 ft3.
What is 100 m3 in ft3?
100 m3 equals 3531.47 ft3.