Speed converter

Convert Feet per Minute to Meters per Minute (SFM to m/min)

1 SFM = 0.3048 m/min. Cutting surface speed between metric and SFM.

Feet per minute to meters per minute conversion table

SFMm/min
10 SFM3.048 m/min
25 SFM7.62 m/min
50 SFM15.24 m/min
75 SFM22.86 m/min
100 SFM30.48 m/min
125 SFM38.1 m/min
150 SFM45.72 m/min
175 SFM53.34 m/min
200 SFM60.96 m/min
250 SFM76.2 m/min
265 SFM80.772 m/min
300 SFM91.44 m/min
350 SFM106.68 m/min
400 SFM121.92 m/min
450 SFM137.16 m/min
500 SFM152.4 m/min
600 SFM182.88 m/min
700 SFM213.36 m/min
800 SFM243.84 m/min
900 SFM274.32 m/min
1000 SFM304.8 m/min
1200 SFM365.76 m/min
1500 SFM457.2 m/min
2000 SFM609.6 m/min
3000 SFM914.4 m/min

How to convert feet per minute to meters per minute

Multiply the value in feet per minute by 0.3048 to get meters per minute. 1 SFM equals 0.3048 m/min, and 1 m/min equals 3.2808 SFM.

About these units

Surface feet per minute is the US unit for cutting speed, the velocity of the tool edge over the work. Speeds-and-feeds charts in the US are built around SFM.

Meters per minute expresses cutting surface speed and line speed in metric practice. Tool catalogs in metric markets publish speeds in m/min.

Common questions

How many meters per minute are in a foot per minute?

1 SFM equals 0.3048 m/min.

How do you convert feet per minute to meters per minute?

Use m/min = SFM × 0.3048. So 1 SFM = 0.3048 m/min, and to go back, 1 m/min = 3.2808 SFM.

What is 100 SFM in m/min?

100 SFM equals 30.48 m/min.

What is 300 SFM in m/min?

300 SFM equals 91.44 m/min.

Convert m/min to SFM or browse all converters.

Download this conversion table as CSV.