Speed converter
Convert Meters per Minute to Feet per Minute (m/min to SFM)
1 m/min = 3.2808 SFM. Cutting surface speed between metric and SFM.
Meters per minute to feet per minute conversion table
| m/min | SFM |
|---|---|
| 5 m/min | 16.4042 SFM |
| 10 m/min | 32.8084 SFM |
| 15 m/min | 49.2126 SFM |
| 20 m/min | 65.6168 SFM |
| 25 m/min | 82.021 SFM |
| 30 m/min | 98.4252 SFM |
| 40 m/min | 131.234 SFM |
| 50 m/min | 164.042 SFM |
| 60 m/min | 196.85 SFM |
| 75 m/min | 246.063 SFM |
| 80 m/min | 262.467 SFM |
| 90 m/min | 295.276 SFM |
| 100 m/min | 328.084 SFM |
| 120 m/min | 393.701 SFM |
| 150 m/min | 492.126 SFM |
| 180 m/min | 590.551 SFM |
| 200 m/min | 656.168 SFM |
| 220 m/min | 721.785 SFM |
| 250 m/min | 820.21 SFM |
| 300 m/min | 984.252 SFM |
| 350 m/min | 1148.29 SFM |
| 400 m/min | 1312.34 SFM |
| 500 m/min | 1640.42 SFM |
| 600 m/min | 1968.5 SFM |
| 800 m/min | 2624.67 SFM |
| 1000 m/min | 3280.84 SFM |
How to convert meters per minute to feet per minute
Multiply the value in meters per minute by 3.2808 to get feet per minute. 1 m/min equals 3.2808 SFM, and 1 SFM equals 0.3048 m/min.
About these units
Meters per minute expresses cutting surface speed and line speed in metric practice. Tool catalogs in metric markets publish speeds in m/min.
Surface feet per minute is the US unit for cutting speed, the velocity of the tool edge over the work. Speeds-and-feeds charts in the US are built around SFM.
Common questions
How many feet per minute are in a meter per minute?
1 m/min equals 3.2808 SFM.
How do you convert meters per minute to feet per minute?
Use SFM = m/min ÷ 0.3048. So 1 m/min = 3.2808 SFM, and to go back, 1 SFM = 0.3048 m/min.
What is 100 m/min in SFM?
100 m/min equals 328.084 SFM.
What is 200 m/min in SFM?
200 m/min equals 656.168 SFM.