Flow Rate converter
Convert Gallons per Minute to Liters per Minute (GPM to L/min)
1 GPM = 3.7854 L/min. Coolant, hydraulic, and process fluid flow.
Gallons per minute to liters per minute conversion table
| GPM | L/min |
|---|---|
| 1 GPM | 3.7854 L/min |
| 2 GPM | 7.5708 L/min |
| 3 GPM | 11.3562 L/min |
| 4 GPM | 15.1416 L/min |
| 5 GPM | 18.9271 L/min |
| 6 GPM | 22.7125 L/min |
| 7 GPM | 26.4979 L/min |
| 8 GPM | 30.2833 L/min |
| 9 GPM | 34.0687 L/min |
| 10 GPM | 37.8541 L/min |
| 15 GPM | 56.7812 L/min |
| 20 GPM | 75.7082 L/min |
| 25 GPM | 94.6353 L/min |
| 30 GPM | 113.562 L/min |
| 40 GPM | 151.416 L/min |
| 50 GPM | 189.271 L/min |
| 75 GPM | 283.906 L/min |
| 100 GPM | 378.541 L/min |
| 150 GPM | 567.812 L/min |
| 200 GPM | 757.082 L/min |
| 250 GPM | 946.353 L/min |
| 500 GPM | 1892.71 L/min |
| 1000 GPM | 3785.41 L/min |
How to convert gallons per minute to liters per minute
Multiply the value in gallons per minute by 3.7854 to get liters per minute. 1 GPM equals 3.7854 L/min, and 1 L/min equals 0.264172 GPM.
About these units
Gallons per minute is the US flow unit for pumps, coolant loops, and process water. One GPM is about 3.79 liters per minute.
Liters per minute is the metric flow unit for coolant, hydraulic, and water systems. Pump curves in metric catalogs plot flow in liters per minute.
Common questions
How many liters per minute are in a gallon per minute?
1 GPM equals 3.7854 L/min.
How do you convert gallons per minute to liters per minute?
Use L/min ≈ GPM × 3.78541. So 1 GPM = 3.7854 L/min, and to go back, 1 L/min = 0.264172 GPM.
What is 10 GPM in L/min?
10 GPM equals 37.8541 L/min.
What is 100 GPM in L/min?
100 GPM equals 378.541 L/min.