Flow Rate converter

Convert Liters per Minute to Gallons per Minute (L/min to GPM)

1 L/min = 0.264172 GPM. Coolant, hydraulic, and process fluid flow.

Liters per minute to gallons per minute conversion table

L/minGPM
1 L/min0.264172 GPM
2 L/min0.528344 GPM
3 L/min0.792516 GPM
4 L/min1.0567 GPM
5 L/min1.3209 GPM
6 L/min1.585 GPM
7 L/min1.8492 GPM
8 L/min2.1134 GPM
9 L/min2.3775 GPM
10 L/min2.6417 GPM
15 L/min3.9626 GPM
20 L/min5.2834 GPM
25 L/min6.6043 GPM
30 L/min7.9252 GPM
40 L/min10.5669 GPM
50 L/min13.2086 GPM
75 L/min19.8129 GPM
100 L/min26.4172 GPM
150 L/min39.6258 GPM
200 L/min52.8344 GPM
250 L/min66.043 GPM
500 L/min132.086 GPM
1000 L/min264.172 GPM

How to convert liters per minute to gallons per minute

Multiply the value in liters per minute by 0.264172 to get gallons per minute. 1 L/min equals 0.264172 GPM, and 1 GPM equals 3.7854 L/min.

About these units

Liters per minute is the metric flow unit for coolant, hydraulic, and water systems. Pump curves in metric catalogs plot flow in liters per minute.

Gallons per minute is the US flow unit for pumps, coolant loops, and process water. One GPM is about 3.79 liters per minute.

Common questions

How many gallons per minute are in a liter per minute?

1 L/min equals 0.264172 GPM.

How do you convert liters per minute to gallons per minute?

Use GPM ≈ L/min × 0.264172. So 1 L/min = 0.264172 GPM, and to go back, 1 GPM = 3.7854 L/min.

What is 10 L/min in GPM?

10 L/min equals 2.6417 GPM.

What is 100 L/min in GPM?

100 L/min equals 26.4172 GPM.

Convert GPM to L/min or browse all converters.

Download this conversion table as CSV.