Density converter
Convert Grams per Cubic Centimeter to Pounds per Cubic Inch (g/cm3 to lb/in3)
1 g/cm3 = 0.036127 lb/in3. Material density for part-weight estimates.
Grams per cubic centimeter to pounds per cubic inch conversion table
| g/cm3 | lb/in3 |
|---|---|
| 0.1 g/cm3 | 0.003613 lb/in3 |
| 0.25 g/cm3 | 0.009032 lb/in3 |
| 0.5 g/cm3 | 0.018064 lb/in3 |
| 0.75 g/cm3 | 0.027095 lb/in3 |
| 0.9 g/cm3 | 0.032515 lb/in3 |
| 0.95 g/cm3 | 0.034321 lb/in3 |
| 1 g/cm3 | 0.036127 lb/in3 |
| 1.05 g/cm3 | 0.037934 lb/in3 |
| 1.2 g/cm3 | 0.043353 lb/in3 |
| 1.4 g/cm3 | 0.050578 lb/in3 |
| 1.5 g/cm3 | 0.054191 lb/in3 |
| 2 g/cm3 | 0.072255 lb/in3 |
| 2.5 g/cm3 | 0.090318 lb/in3 |
| 2.7 g/cm3 | 0.097544 lb/in3 |
| 2.8 g/cm3 | 0.101156 lb/in3 |
| 3 g/cm3 | 0.108382 lb/in3 |
| 4 g/cm3 | 0.144509 lb/in3 |
| 4.5 g/cm3 | 0.162573 lb/in3 |
| 5 g/cm3 | 0.180636 lb/in3 |
| 6 g/cm3 | 0.216764 lb/in3 |
| 7 g/cm3 | 0.252891 lb/in3 |
| 7.2 g/cm3 | 0.260117 lb/in3 |
| 7.85 g/cm3 | 0.283599 lb/in3 |
| 8 g/cm3 | 0.289018 lb/in3 |
| 8.5 g/cm3 | 0.307082 lb/in3 |
| 8.9 g/cm3 | 0.321533 lb/in3 |
| 10 g/cm3 | 0.361273 lb/in3 |
| 11 g/cm3 | 0.3974 lb/in3 |
| 11.3 g/cm3 | 0.408238 lb/in3 |
| 15 g/cm3 | 0.541909 lb/in3 |
| 19.3 g/cm3 | 0.697257 lb/in3 |
How to convert grams per cubic centimeter to pounds per cubic inch
Multiply the value in grams per cubic centimeter by 0.036127 to get pounds per cubic inch. 1 g/cm3 equals 0.036127 lb/in3, and 1 lb/in3 equals 27.6799 g/cm3.
About these units
Grams per cubic centimeter is the common density unit on material datasheets. Water is 1.0, aluminum about 2.7, and steel about 7.85 g/cm3.
Pounds per cubic inch is the US density unit used to estimate part weight from CAD volume. Steel is about 0.284 lb/in3 and aluminum about 0.098.
Common questions
How many pounds per cubic inch are in a gram per cubic centimeter?
1 g/cm3 equals 0.036127 lb/in3.
How do you convert grams per cubic centimeter to pounds per cubic inch?
Use lb/in3 ≈ g/cm3 × 0.0361273. So 1 g/cm3 = 0.036127 lb/in3, and to go back, 1 lb/in3 = 27.6799 g/cm3.
What is 2.7 g/cm3 in lb/in3?
2.7 g/cm3 equals 0.097544 lb/in3.
What is 7.85 g/cm3 in lb/in3?
7.85 g/cm3 equals 0.283599 lb/in3.