Density converter

Convert Pounds per Cubic Inch to Grams per Cubic Centimeter (lb/in3 to g/cm3)

1 lb/in3 = 27.6799 g/cm3. Material density for part-weight estimates.

Pounds per cubic inch to grams per cubic centimeter conversion table

lb/in3g/cm3
0.01 lb/in30.276799 g/cm3
0.02 lb/in30.553598 g/cm3
0.03 lb/in30.830397 g/cm3
0.035 lb/in30.968797 g/cm3
0.04 lb/in31.1072 g/cm3
0.05 lb/in31.384 g/cm3
0.06 lb/in31.6608 g/cm3
0.07 lb/in31.9376 g/cm3
0.08 lb/in32.2144 g/cm3
0.09 lb/in32.4912 g/cm3
0.098 lb/in32.7126 g/cm3
0.1 lb/in32.768 g/cm3
0.15 lb/in34.152 g/cm3
0.16 lb/in34.4288 g/cm3
0.2 lb/in35.536 g/cm3
0.25 lb/in36.92 g/cm3
0.26 lb/in37.1968 g/cm3
0.284 lb/in37.8611 g/cm3
0.29 lb/in38.0272 g/cm3
0.3 lb/in38.304 g/cm3
0.32 lb/in38.8576 g/cm3
0.4 lb/in311.072 g/cm3
0.41 lb/in311.3488 g/cm3
0.5 lb/in313.84 g/cm3
0.7 lb/in319.3759 g/cm3

How to convert pounds per cubic inch to grams per cubic centimeter

Multiply the value in pounds per cubic inch by 27.6799 to get grams per cubic centimeter. 1 lb/in3 equals 27.6799 g/cm3, and 1 g/cm3 equals 0.036127 lb/in3.

About these units

Pounds per cubic inch is the US density unit used to estimate part weight from CAD volume. Steel is about 0.284 lb/in3 and aluminum about 0.098.

Grams per cubic centimeter is the common density unit on material datasheets. Water is 1.0, aluminum about 2.7, and steel about 7.85 g/cm3.

Common questions

How many grams per cubic centimeter are in a pound per cubic inch?

1 lb/in3 equals 27.6799 g/cm3.

How do you convert pounds per cubic inch to grams per cubic centimeter?

Use g/cm3 ≈ lb/in3 × 27.6799. So 1 lb/in3 = 27.6799 g/cm3, and to go back, 1 g/cm3 = 0.036127 lb/in3.

What is 0.1 lb/in3 in g/cm3?

0.1 lb/in3 equals 2.768 g/cm3.

What is 0.284 lb/in3 in g/cm3?

0.284 lb/in3 equals 7.8611 g/cm3.

Convert g/cm3 to lb/in3 or browse all converters.

Download this conversion table as CSV.