Basis Weight converter
Convert Grams per Square Meter to Ounces per Square Yard (GSM to oz/yd2)
1 GSM = 0.029494 oz/yd2. Fabric, nonwoven, and coating basis weight.
Grams per square meter to ounces per square yard conversion table
| GSM | oz/yd2 |
|---|---|
| 10 GSM | 0.294935 oz/yd2 |
| 15 GSM | 0.442403 oz/yd2 |
| 20 GSM | 0.58987 oz/yd2 |
| 25 GSM | 0.737338 oz/yd2 |
| 30 GSM | 0.884806 oz/yd2 |
| 40 GSM | 1.1797 oz/yd2 |
| 50 GSM | 1.4747 oz/yd2 |
| 60 GSM | 1.7696 oz/yd2 |
| 70 GSM | 2.0645 oz/yd2 |
| 80 GSM | 2.3595 oz/yd2 |
| 90 GSM | 2.6544 oz/yd2 |
| 100 GSM | 2.9494 oz/yd2 |
| 120 GSM | 3.5392 oz/yd2 |
| 135 GSM | 3.9816 oz/yd2 |
| 150 GSM | 4.424 oz/yd2 |
| 160 GSM | 4.719 oz/yd2 |
| 180 GSM | 5.3088 oz/yd2 |
| 200 GSM | 5.8987 oz/yd2 |
| 220 GSM | 6.4886 oz/yd2 |
| 250 GSM | 7.3734 oz/yd2 |
| 280 GSM | 8.2582 oz/yd2 |
| 300 GSM | 8.8481 oz/yd2 |
| 340 GSM | 10.0278 oz/yd2 |
| 350 GSM | 10.3227 oz/yd2 |
| 400 GSM | 11.7974 oz/yd2 |
| 450 GSM | 13.2721 oz/yd2 |
| 500 GSM | 14.7468 oz/yd2 |
| 600 GSM | 17.6961 oz/yd2 |
| 800 GSM | 23.5948 oz/yd2 |
| 1000 GSM | 29.4935 oz/yd2 |
How to convert grams per square meter to ounces per square yard
Multiply the value in grams per square meter by 0.029494 to get ounces per square yard. 1 GSM equals 0.029494 oz/yd2, and 1 oz/yd2 equals 33.9057 GSM.
About these units
Grams per square meter is the basis-weight unit for fabric, paper, film, and nonwovens: the mass of one square meter of the material.
Ounces per square yard is the US basis-weight unit for textiles and technical fabrics. One oz/yd2 is about 33.9 GSM.
Common questions
How many ounces per square yard are in a gram per square meter?
1 GSM equals 0.029494 oz/yd2.
How do you convert grams per square meter to ounces per square yard?
Use oz/yd2 ≈ GSM × 0.0294935. So 1 GSM = 0.029494 oz/yd2, and to go back, 1 oz/yd2 = 33.9057 GSM.
What is 100 GSM in oz/yd2?
100 GSM equals 2.9494 oz/yd2.
What is 200 GSM in oz/yd2?
200 GSM equals 5.8987 oz/yd2.