Basis Weight converter

Convert Ounces per Square Yard to Grams per Square Meter (oz/yd2 to GSM)

1 oz/yd2 = 33.9057 GSM. Fabric, nonwoven, and coating basis weight.

Ounces per square yard to grams per square meter conversion table

oz/yd2GSM
0.5 oz/yd216.9529 GSM
1 oz/yd233.9057 GSM
1.5 oz/yd250.8586 GSM
2 oz/yd267.8115 GSM
2.5 oz/yd284.7644 GSM
3 oz/yd2101.717 GSM
3.5 oz/yd2118.67 GSM
4 oz/yd2135.623 GSM
4.5 oz/yd2152.576 GSM
5 oz/yd2169.529 GSM
5.5 oz/yd2186.482 GSM
6 oz/yd2203.434 GSM
6.5 oz/yd2220.387 GSM
7 oz/yd2237.34 GSM
7.5 oz/yd2254.293 GSM
8 oz/yd2271.246 GSM
9 oz/yd2305.152 GSM
10 oz/yd2339.057 GSM
11 oz/yd2372.963 GSM
12 oz/yd2406.869 GSM
14 oz/yd2474.68 GSM
16 oz/yd2542.492 GSM
18 oz/yd2610.303 GSM
20 oz/yd2678.115 GSM
24 oz/yd2813.738 GSM
30 oz/yd21017.17 GSM

How to convert ounces per square yard to grams per square meter

Multiply the value in ounces per square yard by 33.9057 to get grams per square meter. 1 oz/yd2 equals 33.9057 GSM, and 1 GSM equals 0.029494 oz/yd2.

About these units

Ounces per square yard is the US basis-weight unit for textiles and technical fabrics. One oz/yd2 is about 33.9 GSM.

Grams per square meter is the basis-weight unit for fabric, paper, film, and nonwovens: the mass of one square meter of the material.

Common questions

How many grams per square meter are in an ounce per square yard?

1 oz/yd2 equals 33.9057 GSM.

How do you convert ounces per square yard to grams per square meter?

Use GSM ≈ oz/yd2 × 33.9057. So 1 oz/yd2 = 33.9057 GSM, and to go back, 1 GSM = 0.029494 oz/yd2.

What is 5 oz/yd2 in GSM?

5 oz/yd2 equals 169.529 GSM.

What is 10 oz/yd2 in GSM?

10 oz/yd2 equals 339.057 GSM.

Convert GSM to oz/yd2 or browse all converters.

Download this conversion table as CSV.