Torque converter

Convert Inch-Pounds to Newton-Meters (in-lb to Nm)

1 in-lb = 0.112985 Nm. Small-fastener and instrument torque values.

Inch-pounds to newton-meters conversion table

in-lbNm
1 in-lb0.112985 Nm
2 in-lb0.22597 Nm
3 in-lb0.338954 Nm
4 in-lb0.451939 Nm
5 in-lb0.564924 Nm
6 in-lb0.677909 Nm
7 in-lb0.790894 Nm
8 in-lb0.903879 Nm
9 in-lb1.0169 Nm
10 in-lb1.1298 Nm
15 in-lb1.6948 Nm
20 in-lb2.2597 Nm
25 in-lb2.8246 Nm
30 in-lb3.3895 Nm
40 in-lb4.5194 Nm
50 in-lb5.6492 Nm
75 in-lb8.4739 Nm
100 in-lb11.2985 Nm
150 in-lb16.9477 Nm
200 in-lb22.597 Nm
250 in-lb28.2462 Nm
500 in-lb56.4924 Nm
1000 in-lb112.985 Nm

How to convert inch-pounds to newton-meters

Multiply the value in inch-pounds by 0.112985 to get newton-meters. 1 in-lb equals 0.112985 Nm, and 1 Nm equals 8.8507 in-lb.

About these units

The inch-pound is one twelfth of a foot-pound, used for small fasteners, electronics assembly, and instrument torque where foot-pounds are too coarse.

The newton-meter is the SI torque unit, one newton of force on a one-meter arm. Metric fastener torque specs and servo ratings use newton-meters.

Common questions

How many newton-meters are in an inch-pound?

1 in-lb equals 0.112985 Nm.

How do you convert inch-pounds to newton-meters?

Use Nm ≈ in-lb × 0.112985. So 1 in-lb = 0.112985 Nm, and to go back, 1 Nm = 8.8507 in-lb.

What is 10 in-lb in Nm?

10 in-lb equals 1.1298 Nm.

What is 100 in-lb in Nm?

100 in-lb equals 11.2985 Nm.

Convert Nm to in-lb or browse all converters.

Download this conversion table as CSV.