Torque converter

Convert Newton-Meters to Inch-Pounds (Nm to in-lb)

1 Nm = 8.8507 in-lb. Small-fastener and instrument torque values.

Newton-meters to inch-pounds conversion table

Nmin-lb
1 Nm8.8507 in-lb
2 Nm17.7015 in-lb
3 Nm26.5522 in-lb
4 Nm35.403 in-lb
5 Nm44.2537 in-lb
6 Nm53.1045 in-lb
7 Nm61.9552 in-lb
8 Nm70.806 in-lb
9 Nm79.6567 in-lb
10 Nm88.5075 in-lb
15 Nm132.761 in-lb
20 Nm177.015 in-lb
25 Nm221.269 in-lb
30 Nm265.522 in-lb
40 Nm354.03 in-lb
50 Nm442.537 in-lb
75 Nm663.806 in-lb
100 Nm885.075 in-lb
150 Nm1327.61 in-lb
200 Nm1770.15 in-lb
250 Nm2212.69 in-lb
500 Nm4425.37 in-lb
1000 Nm8850.75 in-lb

How to convert newton-meters to inch-pounds

Multiply the value in newton-meters by 8.8507 to get inch-pounds. 1 Nm equals 8.8507 in-lb, and 1 in-lb equals 0.112985 Nm.

About these units

The newton-meter is the SI torque unit, one newton of force on a one-meter arm. Metric fastener torque specs and servo ratings use newton-meters.

The inch-pound is one twelfth of a foot-pound, used for small fasteners, electronics assembly, and instrument torque where foot-pounds are too coarse.

Common questions

How many inch-pounds are in a newton-meter?

1 Nm equals 8.8507 in-lb.

How do you convert newton-meters to inch-pounds?

Use in-lb ≈ Nm × 8.85075. So 1 Nm = 8.8507 in-lb, and to go back, 1 in-lb = 0.112985 Nm.

What is 10 Nm in in-lb?

10 Nm equals 88.5075 in-lb.

What is 100 Nm in in-lb?

100 Nm equals 885.075 in-lb.

Convert in-lb to Nm or browse all converters.

Download this conversion table as CSV.