Length converter

Convert Inches to Millimeters (in to mm)

1 in = 25.4 mm. Reading metric drawings on imperial machines and gauging stock.

Inches to millimeters conversion table

inmm
0.0625 in1.5875 mm
0.125 in3.175 mm
0.1875 in4.7625 mm
0.25 in6.35 mm
0.3125 in7.9375 mm
0.375 in9.525 mm
0.5 in12.7 mm
0.625 in15.875 mm
0.75 in19.05 mm
0.875 in22.225 mm
1 in25.4 mm
1.25 in31.75 mm
1.5 in38.1 mm
2 in50.8 mm
2.5 in63.5 mm
3 in76.2 mm
4 in101.6 mm
5 in127 mm
6 in152.4 mm
8 in203.2 mm
10 in254 mm
12 in304.8 mm
24 in609.6 mm
36 in914.4 mm
48 in1219.2 mm

How to convert inches to millimeters

Multiply the value in inches by 25.4 to get millimeters. 1 in equals 25.4 mm, and 1 mm equals 0.03937 in.

About these units

The inch is the base dimension unit on US engineering drawings, defined exactly as 25.4 millimeters. Shop tolerances are usually expressed in decimal inches rather than fractions.

The millimeter is one thousandth of a meter and the default dimension unit on metric engineering drawings. Machined tolerances are commonly quoted in hundredths of a millimeter.

Common questions

How many millimeters are in an inch?

1 in equals 25.4 mm.

How do you convert inches to millimeters?

Use mm = in × 25.4. So 1 in = 25.4 mm, and to go back, 1 mm = 0.03937 in.

What is 0.25 in in mm?

0.25 in equals 6.35 mm.

What is 0.5 in in mm?

0.5 in equals 12.7 mm.

Convert mm to in or browse all converters.

Download this conversion table as CSV.