Length converter
Convert Millimeters to Inches (mm to in)
1 mm = 0.03937 in. Reading metric drawings on imperial machines and gauging stock.
Millimeters to inches conversion table
| mm | in |
|---|---|
| 0.5 mm | 0.019685 in |
| 1 mm | 0.03937 in |
| 2 mm | 0.07874 in |
| 3 mm | 0.11811 in |
| 4 mm | 0.15748 in |
| 5 mm | 0.19685 in |
| 6 mm | 0.23622 in |
| 8 mm | 0.314961 in |
| 10 mm | 0.393701 in |
| 12 mm | 0.472441 in |
| 15 mm | 0.590551 in |
| 16 mm | 0.629921 in |
| 20 mm | 0.787402 in |
| 25 mm | 0.984252 in |
| 30 mm | 1.1811 in |
| 40 mm | 1.5748 in |
| 50 mm | 1.9685 in |
| 60 mm | 2.3622 in |
| 75 mm | 2.9528 in |
| 100 mm | 3.937 in |
| 150 mm | 5.9055 in |
| 200 mm | 7.874 in |
| 250 mm | 9.8425 in |
| 300 mm | 11.811 in |
| 500 mm | 19.685 in |
| 1000 mm | 39.3701 in |
How to convert millimeters to inches
Multiply the value in millimeters by 0.03937 to get inches. 1 mm equals 0.03937 in, and 1 in equals 25.4 mm.
About these units
The millimeter is one thousandth of a meter and the default dimension unit on metric engineering drawings. Machined tolerances are commonly quoted in hundredths of a millimeter.
The inch is the base dimension unit on US engineering drawings, defined exactly as 25.4 millimeters. Shop tolerances are usually expressed in decimal inches rather than fractions.
Common questions
How many inches are in a millimeter?
1 mm equals 0.03937 in.
How do you convert millimeters to inches?
Use in = mm ÷ 25.4. So 1 mm = 0.03937 in, and to go back, 1 in = 25.4 mm.
What is 10 mm in in?
10 mm equals 0.393701 in.
What is 25 mm in in?
25 mm equals 0.984252 in.