Pressure converter

Convert Kilopascals to Psi (kPa to psi)

1 kPa = 0.145038 psi. Converting datasheet pressures to SI for calculations.

Kilopascals to psi conversion table

kPapsi
1 kPa0.145038 psi
2 kPa0.290075 psi
3 kPa0.435113 psi
4 kPa0.580151 psi
5 kPa0.725189 psi
6 kPa0.870226 psi
7 kPa1.0153 psi
8 kPa1.1603 psi
9 kPa1.3053 psi
10 kPa1.4504 psi
15 kPa2.1756 psi
20 kPa2.9008 psi
25 kPa3.6259 psi
30 kPa4.3511 psi
40 kPa5.8015 psi
50 kPa7.2519 psi
75 kPa10.8778 psi
100 kPa14.5038 psi
150 kPa21.7557 psi
200 kPa29.0075 psi
250 kPa36.2594 psi
300 kPa43.5113 psi
500 kPa72.5189 psi
1000 kPa145.038 psi

How to convert kilopascals to psi

Multiply the value in kilopascals by 0.145038 to get psi. 1 kPa equals 0.145038 psi, and 1 psi equals 6.8948 kPa.

About these units

The kilopascal is 1,000 pascals, the SI pressure unit. HVAC static pressures and lower process pressures are stated in kilopascals.

Pounds per square inch is the standard US pressure unit for compressed air, hydraulics, and tire and vessel ratings. Shop air systems typically run 90 to 125 psi.

Common questions

How many psi are in a kilopascal?

1 kPa equals 0.145038 psi.

How do you convert kilopascals to psi?

Use psi ≈ kPa × 0.145038. So 1 kPa = 0.145038 psi, and to go back, 1 psi = 6.8948 kPa.

What is 10 kPa in psi?

10 kPa equals 1.4504 psi.

What is 100 kPa in psi?

100 kPa equals 14.5038 psi.

Convert psi to kPa or browse all converters.

Download this conversion table as CSV.