Pressure converter

Convert Psi to Kilopascals (psi to kPa)

1 psi = 6.8948 kPa. Converting datasheet pressures to SI for calculations.

Psi to kilopascals conversion table

psikPa
1 psi6.8948 kPa
2 psi13.7895 kPa
3 psi20.6843 kPa
4 psi27.579 kPa
5 psi34.4738 kPa
6 psi41.3685 kPa
7 psi48.2633 kPa
8 psi55.1581 kPa
9 psi62.0528 kPa
10 psi68.9476 kPa
15 psi103.421 kPa
20 psi137.895 kPa
25 psi172.369 kPa
30 psi206.843 kPa
40 psi275.79 kPa
50 psi344.738 kPa
75 psi517.107 kPa
100 psi689.476 kPa
150 psi1034.21 kPa
200 psi1378.95 kPa
250 psi1723.69 kPa
300 psi2068.43 kPa
500 psi3447.38 kPa
1000 psi6894.76 kPa

How to convert psi to kilopascals

Multiply the value in psi by 6.8948 to get kilopascals. 1 psi equals 6.8948 kPa, and 1 kPa equals 0.145038 psi.

About these units

Pounds per square inch is the standard US pressure unit for compressed air, hydraulics, and tire and vessel ratings. Shop air systems typically run 90 to 125 psi.

The kilopascal is 1,000 pascals, the SI pressure unit. HVAC static pressures and lower process pressures are stated in kilopascals.

Common questions

How many kilopascals are in a psi?

1 psi equals 6.8948 kPa.

How do you convert psi to kilopascals?

Use kPa ≈ psi × 6.89476. So 1 psi = 6.8948 kPa, and to go back, 1 kPa = 0.145038 psi.

What is 10 psi in kPa?

10 psi equals 68.9476 kPa.

What is 100 psi in kPa?

100 psi equals 689.476 kPa.

Convert kPa to psi or browse all converters.

Download this conversion table as CSV.