Volume converter

Convert Liters to US Gallons (L to gal)

1 L = 0.264172 gal. Tank capacity, coolant, and fluid volumes.

Liters to US gallons conversion table

Lgal
1 L0.264172 gal
2 L0.528344 gal
3 L0.792516 gal
4 L1.0567 gal
5 L1.3209 gal
6 L1.585 gal
7 L1.8492 gal
8 L2.1134 gal
9 L2.3775 gal
10 L2.6417 gal
15 L3.9626 gal
20 L5.2834 gal
25 L6.6043 gal
30 L7.9252 gal
40 L10.5669 gal
50 L13.2086 gal
75 L19.8129 gal
100 L26.4172 gal
150 L39.6258 gal
200 L52.8344 gal
250 L66.043 gal
500 L132.086 gal
1000 L264.172 gal

How to convert liters to US gallons

Multiply the value in liters by 0.264172 to get US gallons. 1 L equals 0.264172 gal, and 1 gal equals 3.7854 L.

About these units

The liter is one cubic decimeter. Coolant concentrate, chemicals, and tank volumes in metric plants are specified in liters.

The US gallon equals 3.785 liters. Tank sizes, chemical purchases, and coolant volumes in US plants are stated in gallons.

Common questions

How many US gallons are in a liter?

1 L equals 0.264172 gal.

How do you convert liters to US gallons?

Use gal ≈ L × 0.264172. So 1 L = 0.264172 gal, and to go back, 1 gal = 3.7854 L.

What is 10 L in gal?

10 L equals 2.6417 gal.

What is 100 L in gal?

100 L equals 26.4172 gal.

Convert gal to L or browse all converters.

Download this conversion table as CSV.