Volume converter
Convert US Gallons to Liters (gal to L)
1 gal = 3.7854 L. Tank capacity, coolant, and fluid volumes.
US gallons to liters conversion table
| gal | L |
|---|---|
| 1 gal | 3.7854 L |
| 2 gal | 7.5708 L |
| 3 gal | 11.3562 L |
| 4 gal | 15.1416 L |
| 5 gal | 18.9271 L |
| 6 gal | 22.7125 L |
| 7 gal | 26.4979 L |
| 8 gal | 30.2833 L |
| 9 gal | 34.0687 L |
| 10 gal | 37.8541 L |
| 15 gal | 56.7812 L |
| 20 gal | 75.7082 L |
| 25 gal | 94.6353 L |
| 30 gal | 113.562 L |
| 40 gal | 151.416 L |
| 50 gal | 189.271 L |
| 75 gal | 283.906 L |
| 100 gal | 378.541 L |
| 150 gal | 567.812 L |
| 200 gal | 757.082 L |
| 250 gal | 946.353 L |
| 500 gal | 1892.71 L |
| 1000 gal | 3785.41 L |
How to convert US gallons to liters
Multiply the value in US gallons by 3.7854 to get liters. 1 gal equals 3.7854 L, and 1 L equals 0.264172 gal.
About these units
The US gallon equals 3.785 liters. Tank sizes, chemical purchases, and coolant volumes in US plants are stated in gallons.
The liter is one cubic decimeter. Coolant concentrate, chemicals, and tank volumes in metric plants are specified in liters.
Common questions
How many liters are in a US gallon?
1 gal equals 3.7854 L.
How do you convert US gallons to liters?
Use L ≈ gal × 3.78541. So 1 gal = 3.7854 L, and to go back, 1 L = 0.264172 gal.
What is 10 gal in L?
10 gal equals 37.8541 L.
What is 100 gal in L?
100 gal equals 378.541 L.