Mass converter

Convert Metric Tons to US Tons (t to ton)

1 t = 1.1023 ton. Bulk material and scrap tonnage between systems.

Metric tons to US tons conversion table

tton
1 t1.1023 ton
2 t2.2046 ton
3 t3.3069 ton
4 t4.4092 ton
5 t5.5116 ton
6 t6.6139 ton
7 t7.7162 ton
8 t8.8185 ton
9 t9.9208 ton
10 t11.0231 ton
15 t16.5347 ton
20 t22.0462 ton
25 t27.5578 ton
30 t33.0693 ton
40 t44.0925 ton
50 t55.1156 ton
75 t82.6733 ton
100 t110.231 ton
150 t165.347 ton
200 t220.462 ton
250 t275.578 ton
500 t551.156 ton
1000 t1102.31 ton

How to convert metric tons to US tons

Multiply the value in metric tons by 1.1023 to get US tons. 1 t equals 1.1023 ton, and 1 ton equals 0.907185 t.

About these units

The metric ton (tonne) is 1,000 kilograms, about 2,204.6 pounds. Bulk material, scrap, and freight in metric markets trade per tonne.

The US short ton is 2,000 pounds, about 907.2 kilograms. US scrap, steel, and freight pricing is quoted per short ton.

Common questions

How many US tons are in a metric ton?

1 t equals 1.1023 ton.

How do you convert metric tons to US tons?

Use ton ≈ t × 1.10231. So 1 t = 1.1023 ton, and to go back, 1 ton = 0.907185 t.

What is 10 t in ton?

10 t equals 11.0231 ton.

What is 100 t in ton?

100 t equals 110.231 ton.

Convert ton to t or browse all converters.

Download this conversion table as CSV.