Mass converter
Convert US Tons to Metric Tons (ton to t)
1 ton = 0.907185 t. Bulk material and scrap tonnage between systems.
US tons to metric tons conversion table
| ton | t |
|---|---|
| 1 ton | 0.907185 t |
| 2 ton | 1.8144 t |
| 3 ton | 2.7216 t |
| 4 ton | 3.6287 t |
| 5 ton | 4.5359 t |
| 6 ton | 5.4431 t |
| 7 ton | 6.3503 t |
| 8 ton | 7.2575 t |
| 9 ton | 8.1647 t |
| 10 ton | 9.0718 t |
| 15 ton | 13.6078 t |
| 20 ton | 18.1437 t |
| 25 ton | 22.6796 t |
| 30 ton | 27.2155 t |
| 40 ton | 36.2874 t |
| 50 ton | 45.3592 t |
| 75 ton | 68.0389 t |
| 100 ton | 90.7185 t |
| 150 ton | 136.078 t |
| 200 ton | 181.437 t |
| 250 ton | 226.796 t |
| 500 ton | 453.592 t |
| 1000 ton | 907.185 t |
How to convert US tons to metric tons
Multiply the value in US tons by 0.907185 to get metric tons. 1 ton equals 0.907185 t, and 1 t equals 1.1023 ton.
About these units
The US short ton is 2,000 pounds, about 907.2 kilograms. US scrap, steel, and freight pricing is quoted per short ton.
The metric ton (tonne) is 1,000 kilograms, about 2,204.6 pounds. Bulk material, scrap, and freight in metric markets trade per tonne.
Common questions
How many metric tons are in a US ton?
1 ton equals 0.907185 t.
How do you convert US tons to metric tons?
Use t ≈ ton × 0.907185. So 1 ton = 0.907185 t, and to go back, 1 t = 1.1023 ton.
What is 10 ton in t?
10 ton equals 9.0718 t.
What is 100 ton in t?
100 ton equals 90.7185 t.