Area converter

Convert Square Feet to Square Meters (ft2 to m2)

1 ft2 = 0.092903 m2. Floor space, sheet area, and coating coverage.

Square feet to square meters conversion table

ft2m2
1 ft20.092903 m2
2 ft20.185806 m2
3 ft20.278709 m2
4 ft20.371612 m2
5 ft20.464515 m2
6 ft20.557418 m2
7 ft20.650321 m2
8 ft20.743224 m2
9 ft20.836127 m2
10 ft20.92903 m2
15 ft21.3935 m2
20 ft21.8581 m2
25 ft22.3226 m2
30 ft22.7871 m2
40 ft23.7161 m2
50 ft24.6452 m2
75 ft26.9677 m2
100 ft29.2903 m2
150 ft213.9355 m2
200 ft218.5806 m2
250 ft223.2258 m2
500 ft246.4515 m2
1000 ft292.903 m2

How to convert square feet to square meters

Multiply the value in square feet by 0.092903 to get square meters. 1 ft2 equals 0.092903 m2, and 1 m2 equals 10.7639 ft2.

About these units

The square foot is the US area unit for floor space, sheet goods, and coating coverage. A square meter is about 10.76 square feet.

The square meter is the SI area unit, used for sheet and coil coverage, floor space, and coating consumption per unit area.

Common questions

How many square meters are in a square foot?

1 ft2 equals 0.092903 m2.

How do you convert square feet to square meters?

Use m2 = ft2 × 0.09290304. So 1 ft2 = 0.092903 m2, and to go back, 1 m2 = 10.7639 ft2.

What is 10 ft2 in m2?

10 ft2 equals 0.92903 m2.

What is 100 ft2 in m2?

100 ft2 equals 9.2903 m2.

Convert m2 to ft2 or browse all converters.

Download this conversion table as CSV.