Area converter

Convert Square Meters to Square Feet (m2 to ft2)

1 m2 = 10.7639 ft2. Floor space, sheet area, and coating coverage.

Square meters to square feet conversion table

m2ft2
1 m210.7639 ft2
2 m221.5278 ft2
3 m232.2917 ft2
4 m243.0556 ft2
5 m253.8196 ft2
6 m264.5835 ft2
7 m275.3474 ft2
8 m286.1113 ft2
9 m296.8752 ft2
10 m2107.639 ft2
15 m2161.459 ft2
20 m2215.278 ft2
25 m2269.098 ft2
30 m2322.917 ft2
40 m2430.556 ft2
50 m2538.196 ft2
75 m2807.293 ft2
100 m21076.39 ft2
150 m21614.59 ft2
200 m22152.78 ft2
250 m22690.98 ft2
500 m25381.96 ft2
1000 m210763.91 ft2

How to convert square meters to square feet

Multiply the value in square meters by 10.7639 to get square feet. 1 m2 equals 10.7639 ft2, and 1 ft2 equals 0.092903 m2.

About these units

The square meter is the SI area unit, used for sheet and coil coverage, floor space, and coating consumption per unit area.

The square foot is the US area unit for floor space, sheet goods, and coating coverage. A square meter is about 10.76 square feet.

Common questions

How many square feet are in a square meter?

1 m2 equals 10.7639 ft2.

How do you convert square meters to square feet?

Use ft2 = m2 ÷ 0.09290304. So 1 m2 = 10.7639 ft2, and to go back, 1 ft2 = 0.092903 m2.

What is 10 m2 in ft2?

10 m2 equals 107.639 ft2.

What is 100 m2 in ft2?

100 m2 equals 1076.39 ft2.

Convert ft2 to m2 or browse all converters.

Download this conversion table as CSV.