Arkansas energy profile
Manufacturing energy costs in Arkansas
Arkansas plants pay 7.85 cents per kWh for industrial power as of Aug 2026, which puts the state 18.6% under the national average and 8 of 51 (50 states and DC), counting from the cheapest.
Current prices in Arkansas
- Industrial electricity: 7.85 cents per kWh (Aug 2026, EIA).
- Commercial electricity, the rate a warehouse or distribution center in Arkansas typically pays: 11.73 cents per kWh.
- Industrial natural gas: $7.49 per Mcf (Aug 2026), 72.6% above the national average.
- Just below Arkansas on the price ladder: Kentucky at 7.37, Washington at 7.43, Mississippi at 7.57 cents. Just above: South Carolina at 7.88, Montana at 7.97, Alabama at 8.11 cents.
What the rate does to operating cost
- A 10 kW machine running a 4,000 hour year costs about $3,140 in electricity at Arkansas rates versus $3,856 at the national average; at 50 kW the gap is $15,700 versus $19,280, and at 200 kW it is $62,800 versus $77,120.
- For site selection and quoting, Arkansas sits on the favorable side of the power map. Processes that live or die on electricity cost, from electrolysis to induction heating, price out better here than in most states.
Cost to manufacture in Arkansas
- Arkansas scores 91.3 on the MFG Calcs State Cost-to-Manufacture Index, where the U.S. is 100: tied for the 2nd lowest of 51 (electricity averaged over the 12 months to Aug 2026, wages from the 2025 survey).
- Its labor factor (manufacturing wages) is 92.6 and its energy factor (industrial electricity) 76.8; the index weighs wages at 92% and electricity at 8%, their shares of what manufacturers spend on labor and purchased energy, and leaves out taxes, land and incentives.
What factory labor pays in Arkansas
- Industrial production managers: $56.79/hr median in Arkansas versus $60.61 nationally (OEWS 2025).
- Industrial engineers: $47.31/hr median in Arkansas versus $49.25 nationally (OEWS 2025).
- Production supervisors: $30.33/hr median in Arkansas versus $35.79 nationally (OEWS 2025).
- Industrial machinery mechanics: $28.73/hr median in Arkansas versus $31.02 nationally (OEWS 2025).
- Tool and die makers: $27.33/hr median in Arkansas versus $30.79 nationally (OEWS 2025).
- Machinists: $24.59/hr median in Arkansas versus $28.24 nationally (OEWS 2025).
Manufacturing jobs in Arkansas
- Arkansas had 159,500 manufacturing jobs in Oct 2026, the 27th most of 51 (BLS State and Metro Area Employment, not seasonally adjusted).
- That is up 0.4% from Oct 2025.
Manufacturing base in Arkansas
- Arkansas has 2,526 manufacturing establishments employing about 164,240 workers (Census County Business Patterns, 2023).
- Average pay per manufacturing employee is $59,550, 19% below the U.S. average of $73,202.
- Largest sectors by establishment count: fabricated metal products (456), wood product manufacturing (274), food manufacturing (269), machinery manufacturing (188), printing and related support (179).
Manufacturing economy in Arkansas
- Manufacturing added $25.1B to Arkansas's economy in 2025, 12.8% of the state's GDP, the 32nd largest of the 50 states and DC (BEA).
Sources and update cadence
- Prices come from the U.S. Energy Information Administration, jobs from the Bureau of Labor Statistics, establishments and payroll from the Census Bureau and GDP from the Bureau of Economic Analysis; each refreshes automatically when the agency publishes, and this page archives every month and year it shows so the Arkansas history keeps deepening.
Last reviewed 2026-11-20.