Montana energy profile

Manufacturing energy costs in Montana

The current industrial power rate in Montana is 7.97 cents per kWh (Aug 2026, EIA), ranking 10 of 51 (50 states and DC) and sitting 17.3% below the national average.

Current prices in Montana

  • Industrial electricity: 7.97 cents per kWh (Aug 2026, EIA).
  • Commercial electricity, the rate a warehouse or distribution center in Montana typically pays: 13.64 cents per kWh.
  • Industrial natural gas: $6.51 per Mcf (Aug 2026), 50% above the national average.
  • Just below Montana on the price ladder: Mississippi at 7.57, Arkansas at 7.85, South Carolina at 7.88 cents. Just above: Alabama at 8.11, North Dakota at 8.12, Oklahoma at 8.16 cents.

What the rate does to operating cost

  • A 10 kW machine running a 4,000 hour year costs about $3,188 in electricity at Montana rates versus $3,856 at the national average; at 50 kW the gap is $15,940 versus $19,280, and at 200 kW it is $63,760 versus $77,120.
  • For site selection and quoting, Montana sits on the favorable side of the power map. Processes that live or die on electricity cost, from electrolysis to induction heating, price out better here than in most states.

Cost to manufacture in Montana

  • Montana scores 100.5 on the MFG Calcs State Cost-to-Manufacture Index, where the U.S. is 100: the 25th lowest of 51 (electricity averaged over the 12 months to Aug 2026, wages from the 2025 survey).
  • Its labor factor (manufacturing wages) is 102.5 and its energy factor (industrial electricity) 77.8; the index weighs wages at 92% and electricity at 8%, their shares of what manufacturers spend on labor and purchased energy, and leaves out taxes, land and incentives.

What factory labor pays in Montana

  • Industrial production managers: $58.03/hr median in Montana versus $60.61 nationally (OEWS 2025).
  • Industrial engineers: $50.21/hr median in Montana versus $49.25 nationally (OEWS 2025).
  • Production supervisors: $33.06/hr median in Montana versus $35.79 nationally (OEWS 2025).
  • Industrial machinery mechanics: $32.33/hr median in Montana versus $31.02 nationally (OEWS 2025).
  • Machinists: $29.29/hr median in Montana versus $28.24 nationally (OEWS 2025).
  • Quality inspectors and testers: $27.92/hr median in Montana versus $23.35 nationally (OEWS 2025).

Manufacturing jobs in Montana

  • Montana had 20,600 manufacturing jobs in Oct 2026, the 47th most of 51 (BLS State and Metro Area Employment, not seasonally adjusted).
  • That is down 1.0% from Oct 2025.

Manufacturing base in Montana

  • Montana has 1,393 manufacturing establishments employing about 21,825 workers (Census County Business Patterns, 2023).
  • Average pay per manufacturing employee is $64,517, 12% below the U.S. average of $73,202.
  • Largest sectors by establishment count: fabricated metal products (243), food manufacturing (177), wood product manufacturing (149), furniture and related products (106), printing and related support (96).

Manufacturing economy in Montana

  • Manufacturing added $4.1B to Montana's economy in 2025, 5% of the state's GDP, the 46th largest of the 50 states and DC (BEA).

Sources and update cadence

  • Prices come from the U.S. Energy Information Administration, jobs from the Bureau of Labor Statistics, establishments and payroll from the Census Bureau and GDP from the Bureau of Economic Analysis; each refreshes automatically when the agency publishes, and this page archives every month and year it shows so the Montana history keeps deepening.

Last reviewed 2026-11-20.