Manufacturing Economy Monitor
U.S. Manufacturing Capital Investment
U.S. manufacturers invested $813B in structures, equipment, and intellectual property in 2025, up 2.7% from the year before, per Bureau of Economic Analysis fixed-asset accounts. The sector's net capital stock stands at $6.26T, and the average age of manufacturing assets is 12.8 years, a measure of how much of America's factory base is due for renewal.
The current reading
- Annual investment: $813B in 2025 (+2.7% YoY).
- Net capital stock: $6.26T at current cost (2025).
- Average asset age: 12.8 years, tracked annually since 1947.
Frequently asked questions
- How much do U.S. manufacturers invest each year? U.S. manufacturers invested $813B in private fixed assets (structures, equipment, and intellectual property) in 2025, up 2.7% year over year, per BEA fixed-asset accounts tracked annually since 1947.
- How old are America's factories and equipment? The average age of U.S. manufacturing fixed assets is 12.8 years (2025, current-cost basis). Rising average age means investment is not keeping pace with depreciation; the full series back to 1947 is charted above.
- How much capital stock does U.S. manufacturing hold? The net stock of private manufacturing fixed assets is $6.26T at current cost (2025). That is the replacement value of every factory building, machine, and piece of manufacturing IP in the country, net of depreciation.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.