HTS Heading 0302
Fish, fresh or chilled, excluding fish fillets and other fish meat of heading 0304
All 99 HTS codes under heading 0302 (fish, fresh or chilled), with their duty rates from the 2026 HTS Revision 23. General duty Free to 15%, some per unit.
Every line of heading 0302
- 0302 Fish, fresh or chilled, excluding fish fillets and other fish meat of heading 0304.
- 0302.11.00 Trout (Salmo trutta, Oncorhynchus mykiss, Oncorhynchus clarki, Oncorhynchus aguabonita, Oncorhynchus gilae, Oncorhynchus apache and Oncorhynchus chrysogaster): General Free; Special none; Column 2 2.2¢/kg.
- 0302.11.00.10 Rainbow trout (Salmo gairdneri), farmed (kg).
- 0302.11.00.90 Other (under: Trout (Salmo trutta, Oncorhynchus mykiss, Oncorhynchus clarki, Oncorhynchus aguabonita, Oncorhynchus gilae, Oncorhynchus apache and Oncorhynchus chrysogaster)) (kg).
- 0302.13.00 Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus): General Free; Special none; Column 2 4.4¢/kg.
- 0302.13.00.13 Farmed (under: Chinook (king)) (kg).
- 0302.13.00.14 Not farmed (under: Chinook (king)) (kg).
- 0302.13.00.22 Chum (dog) (under: Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus)) (kg).
- 0302.13.00.32 Pink (humpie) (under: Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus)) (kg).
- 0302.13.00.42 Sockeye (red) (under: Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus)) (kg).
- 0302.13.00.53 Farmed (under: Coho (silver)) (kg).
- 0302.13.00.54 Not farmed (under: Coho (silver)) (kg).
- 0302.13.00.62 Other (under: Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus)) (kg).
- 0302.14.00 Atlantic salmon (Salmo salar) and Danube salmon (Hucho hucho): General Free; Special none; Column 2 4.4¢/kg.
- 0302.14.00.03 Farmed (under: Atlantic) (kg).
- 0302.14.00.04 Not farmed (under: Atlantic) (kg).
- 0302.14.00.62 Other (under: Atlantic salmon (Salmo salar) and Danube salmon (Hucho hucho)) (kg).
- 0302.19.00.00 Other (under: Salmonidae, excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.21.00 Halibut and Greenland turbot (Reinhardtius hippoglossoides, Hippoglossus hippoglossus, Hippoglossus stenolepis): General Free; Special none; Column 2 4.4¢/kg.
- 0302.21.00.10 Atlantic (under: Halibut and Greenland turbot (Reinhardtius hippoglossoides, Hippoglossus hippoglossus, Hippoglossus stenolepis)) (kg).
- 0302.21.00.20 Pacific (under: Halibut and Greenland turbot (Reinhardtius hippoglossoides, Hippoglossus hippoglossus, Hippoglossus stenolepis)) (kg).
- 0302.21.00.90 Other (including Greenland) (under: Halibut and Greenland turbot (Reinhardtius hippoglossoides, Hippoglossus hippoglossus, Hippoglossus stenolepis)) (kg).
- 0302.22.00.00 Plaice (Pleuronectes platessa) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.23.00.00 Sole (Solea spp.) (under: Flat fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae and Citharidae), excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General 1.1¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 2.2¢/kg.
- 0302.24.00.00 Turbots (Psetta maxima) (under: Flat fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae and Citharidae), excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.29.01 Other (under: Flat fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae and Citharidae), excluding edible fish offal of subheadings 0302.91 to 0302.99): General Free; Special none; Column 2 2.2¢/kg.
- 0302.29.01.10 Flounder (under: Other) (kg).
- 0302.29.01.90 Other (under: Other) (kg).
- 0302.31.00.00 Albacore or longfinned tunas (Thunnus alalunga) (kg): General Free; Special none; Column 2 Free.
- 0302.32.00.00 Yellowfin tunas (Thunnus albacares) (kg): General Free; Special none; Column 2 Free.
- 0302.33.00.00 Skipjack tuna (stripe-bellied bonito) (Katsuwonus pelamis) (kg): General Free; Special none; Column 2 Free.
- 0302.34.00.00 Bigeye tunas (Thunnus obesus) (kg): General Free; Special none; Column 2 Free.
- 0302.35.01.00 Atlantic and Pacific bluefin tunas (Thunnus thynnus, Thunnus orientalis) (kg): General Free; Special none; Column 2 Free.
- 0302.36.00.00 Southern bluefin tunas (Thunnus maccoyii) (kg): General Free; Special none; Column 2 Free.
- 0302.39.02.00 Other (under: Tunas (of the genus Thunnus), skipjack tuna (stripe-bellied bonito)(Katsuwonus pelamis), excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 Free.
- 0302.41.00.00 Herrings (Clupea harengus, Clupea pallasii) (kg): General Free; Special none; Column 2 Free.
- 0302.42.00.00 Anchovies (Engraulis spp.) (under: Herrings (Clupea harengus, Clupea pallasii), anchovies (Engraulis spp.), sardines (Sardina pilchardus, Sardinops spp.), sardinella (Sardinella spp.), brisling or sprats (Sprattus sprattus), mackerel (Scomber scombrus, Scomber australasicus, Scomber japonicus), Indian mackerels (Rastrelliger spp.), seerfishes (Scomberomorus spp.), jack and horse mackerel (Trachurus spp.), jacks, crevalles (Caranx spp.), cobia (Rachycentron canadum), silver pomfrets (Pampus spp.), Pacific saury (Cololabis saira), scads (Decapterus spp.), capelin (Mallotus villosus), swordfish (Xiphias gladius), Kawakawa (Euthynnus affinis), bonitos (Sarda spp.), marlins, sailfishes, spearfish (Istiophoridae), excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 Free.
- 0302.43.00.00 Sardines (Sardina pilchardus, Sardinops spp.), sardinella (Sardinella spp.), brisling or sprats (Sprattus sprattus) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.44.00.00 Mackerel (Scomber scombrus, Scomber australasicus, Scomber japonicus) (kg): General Free; Special none; Column 2 4.4¢/kg.
- 0302.45 Jack and horse mackerel (Trachurus spp).
- 0302.45.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.45.50.00 Other (under: Jack and horse mackerel (Trachurus spp)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.46 Cobia (Rachycentron canadum) (under: Herrings (Clupea harengus, Clupea pallasii), anchovies (Engraulis spp.), sardines (Sardina pilchardus, Sardinops spp.), sardinella (Sardinella spp.), brisling or sprats (Sprattus sprattus), mackerel (Scomber scombrus, Scomber australasicus, Scomber japonicus), Indian mackerels (Rastrelliger spp.), seerfishes (Scomberomorus spp.), jack and horse mackerel (Trachurus spp.), jacks, crevalles (Caranx spp.), cobia (Rachycentron canadum), silver pomfrets (Pampus spp.), Pacific saury (Cololabis saira), scads (Decapterus spp.), capelin (Mallotus villosus), swordfish (Xiphias gladius), Kawakawa (Euthynnus affinis), bonitos (Sarda spp.), marlins, sailfishes, spearfish (Istiophoridae), excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.46.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.46.50.00 Other (under: Cobia (Rachycentron canadum)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.47.00 Swordfish (Xiphias gladius) (under: Herrings (Clupea harengus, Clupea pallasii), anchovies (Engraulis spp.), sardines (Sardina pilchardus, Sardinops spp.), sardinella (Sardinella spp.), brisling or sprats (Sprattus sprattus), mackerel (Scomber scombrus, Scomber australasicus, Scomber japonicus), Indian mackerels (Rastrelliger spp.), seerfishes (Scomberomorus spp.), jack and horse mackerel (Trachurus spp.), jacks, crevalles (Caranx spp.), cobia (Rachycentron canadum), silver pomfrets (Pampus spp.), Pacific saury (Cololabis saira), scads (Decapterus spp.), capelin (Mallotus villosus), swordfish (Xiphias gladius), Kawakawa (Euthynnus affinis), bonitos (Sarda spp.), marlins, sailfishes, spearfish (Istiophoridae), excluding edible fish offal of subheadings 0302.91 to 0302.99): General Free; Special none; Column 2 2.2¢/kg.
- 0302.47.00.10 Steaks (under: Swordfish (Xiphias gladius)) (kg).
- 0302.47.00.90 Other (under: Swordfish (Xiphias gladius)) (kg).
- 0302.49.00.00 Other (under: Herrings (Clupea harengus, Clupea pallasii), anchovies (Engraulis spp.), sardines (Sardina pilchardus, Sardinops spp.), sardinella (Sardinella spp.), brisling or sprats (Sprattus sprattus), mackerel (Scomber scombrus, Scomber australasicus, Scomber japonicus), Indian mackerels (Rastrelliger spp.), seerfishes (Scomberomorus spp.), jack and horse mackerel (Trachurus spp.), jacks, crevalles (Caranx spp.), cobia (Rachycentron canadum), silver pomfrets (Pampus spp.), Pacific saury (Cololabis saira), scads (Decapterus spp.), capelin (Mallotus villosus), swordfish (Xiphias gladius), Kawakawa (Euthynnus affinis), bonitos (Sarda spp.), marlins, sailfishes, spearfish (Istiophoridae), excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.51.00 Cod (Gadus morhua, Gadus ogac, Gadus macrocephalus): General Free; Special none; Column 2 2.2¢/kg.
- 0302.51.00.10 Atlantic (under: Cod (Gadus morhua, Gadus ogac, Gadus macrocephalus)) (kg).
- 0302.51.00.90 Other (under: Cod (Gadus morhua, Gadus ogac, Gadus macrocephalus)) (kg).
- 0302.52.00.00 Haddock (Melanogrammus aeglefinus) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.53.00.00 Coalfish (Pollachius virens) (under: Fish of the families Bregmacerotidae, Euclichthyidae Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae, excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.54 Hake (Merluccius spp., Urophycis spp.).
- 0302.54.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.54.50.00 Other (under: Hake (Merluccius spp., Urophycis spp.)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.55 Alaska pollock (Theragra chalcogramma).
- 0302.55.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.55.50.00 Other (under: Alaska pollock (Theragra chalcogramma)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.56 Blue whitings (Micromesistius poutassou, Micromesistius australis).
- 0302.56.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.56.50.00 Other (under: Blue whitings (Micromesistius poutassou, Micromesistius australis)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.59 Other (under: Fish of the families Bregmacerotidae, Euclichthyidae Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae, excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.59.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.59.50 Other (under: Other): General Free; Special none; Column 2 2.2¢/kg.
- 0302.59.50.10 Pollock (under: Other) (kg).
- 0302.59.50.90 Other (under: Other) (kg).
- 0302.71 Tilapias (Oreochromis spp.) (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.), excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.71.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.71.50.00 Other (under: Tilapias (Oreochromis spp.)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.72 Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.).
- 0302.72.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.72.50 Other (under: Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.)): General Free; Special none; Column 2 2.2¢/kg.
- 0302.72.50.01 Ictalurus spp. (under: Other) (kg).
- 0302.72.50.04 Pangasius spp. including basa and tra (kg).
- 0302.72.50.34 Other (under: Other) (kg).
- 0302.73 Carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.).
- 0302.73.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.73.50.00 Other (under: Carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.74.00.00 Eels (Anguilla spp.) (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.), excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.79 Other (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.), excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.79.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.79.50 Other (under: Other): General Free; Special none; Column 2 2.2¢/kg.
- 0302.79.50.25 Nile perch (under: Other) (kg).
- 0302.79.50.76 Other (under: Other) (kg).
- 0302.81.00 Dogfish and other sharks (under: Other fish, excluding edible fish offal of subheadings 0302.91 to 0302.99): General Free; Special none; Column 2 2.2¢/kg.
- 0302.81.00.11 Dogfish (Squalus spp.) (under: Dogfish and other sharks) (kg).
- 0302.81.00.91 Other (under: Dogfish and other sharks) (kg).
- 0302.82.00.00 Rays and skates (Rajidae) (under: Other fish, excluding edible fish offal of subheadings 0302.91 to 0302.99) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.83.00.00 Toothfish (Dissostichus spp.) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.84 Seabass (Dicentrarchus spp.) (under: Other fish, excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.84.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.84.50.00 Other (under: Seabass (Dicentrarchus spp.)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.85 Seabream (Sparidae) (under: Other fish, excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.85.11.00 Scaled (whether or not heads, viscera and/or fins have been removed, but not otherwise processed), in immediate containers weighing with their contents 6.8 kg or less (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.85.50.00 Other (under: Seabream (Sparidae)) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.89 Other (under: Other fish, excluding edible fish offal of subheadings 0302.91 to 0302.99).
- 0302.89.11 Scaled (whether or not heads, viscera and/or fins have been processed), in immediate containers weighing with their contents 6.8 kg or less: General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0302.89.11.20 Sable fish (Anoplopoma fimbria) (kg).
- 0302.89.11.40 Other (under: Scaled (whether or not heads, viscera and/or fins have been processed), in immediate containers weighing with their contents 6.8 kg or less) (kg).
- 0302.89.50 Other (under: Other): General Free; Special none; Column 2 2.2¢/kg.
- 0302.89.50.07 Pike (under: Fresh-water fish) (kg).
- 0302.89.50.10 Pickerel (under: Fresh-water fish) (kg).
- 0302.89.50.13 Pike perch (including yellow pike) (kg).
- 0302.89.50.25 Other (under: Perch) (kg).
- 0302.89.50.28 Bass (under: Fresh-water fish) (kg).
- 0302.89.50.31 Whitefish (under: Fresh-water fish) (kg).
- 0302.89.50.34 Other (under: Fresh-water fish) (kg).
- 0302.89.50.37 Smelts (under: Other) (kg).
- 0302.89.50.40 Cusk (under: Other) (kg).
- 0302.89.50.49 Shad and sturgeon (under: Other) (kg).
- 0302.89.50.52 Sable fish (Anoplopoma fimbria) (kg).
- 0302.89.50.55 Ocean perch (under: Other) (kg).
- 0302.89.50.58 Snapper (Lutjanidae) (under: Other) (kg).
- 0302.89.50.61 Grouper (under: Other) (kg).
- 0302.89.50.64 Lingcod (Ophiodon elongatus) (under: Other) (kg).
- 0302.89.50.67 Monkfish (Lophius spp.) (under: Other) (kg).
- 0302.89.50.70 Atka mackerel (Atkafish) (Pleurogrammus monopterygius) (kg).
- 0302.89.50.72 Dolphin fish (mahi mahi) (Coryphaena spp.) (kg).
- 0302.89.50.77 Other (under: Other) (kg).
- 0302.91 Livers, roes and milt (under: Livers, roes, milt, fish fins, heads, tails, maws and other edible fish offal).
- 0302.91.20.00 Sturgeon roe (under: Livers, roes and milt) (kg): General 15%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 0302.91.40 Other (under: Livers, roes and milt): General Free; Special none; Column 2 44¢/kg.
- 0302.91.40.10 Mullet roe (under: Other) (kg).
- 0302.91.40.90 Other (under: Other) (kg).
- 0302.92.00.00 Shark fins (under: Livers, roes, milt, fish fins, heads, tails, maws and other edible fish offal) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 0302.99.00.00 Other (under: Livers, roes, milt, fish fins, heads, tails, maws and other edible fish offal) (kg): General Free; Special none; Column 2 44¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.