HTS Heading 0301
Live fish
All 13 HTS codes under heading 0301 (live fish), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0301
- 0301 Live fish.
- 0301.11.00 Freshwater (under: Ornamental fish): General Free; Special none; Column 2 Free.
- 0301.11.00.10 Koi (common) carp (Cyprinus carpio) (kg).
- 0301.11.00.20 Goldfish( Carassius auratus), Crucian carp (Carassius carassius) (kg).
- 0301.11.00.90 Other (under: Freshwater) (kg).
- 0301.19.00.00 Other (under: Ornamental fish) (kg): General Free; Special none; Column 2 Free.
- 0301.91.00.00 Trout (Salmo trutta, Oncorhynchus mykiss, Oncorhynchus clarki, Oncorhynchus aguabonita, Oncorhynchus gilae, Oncorhynchus apache and Oncorhynchus chrysogaster) (kg): General Free; Special none; Column 2 Free.
- 0301.92.00.00 Eels (Anguilla spp.) (under: Other live fish) (kg): General Free; Special none; Column 2 Free.
- 0301.93.02 Carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.): General Free; Special none; Column 2 Free.
- 0301.93.02.10 Grass carp (Ctenopharyngodon idellus), silver carp (Hypophthalmichthys molitrix) and bighead carp (Aristichthys nobilis) (kg).
- 0301.93.02.90 Other (under: Carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.)) (kg).
- 0301.94.01.00 Atlantic and Pacific bluefin tunas (Thunnus thynnus, Thunnus orientalis) (kg): General Free; Special none; Column 2 Free.
- 0301.95.00.00 Southern Bluefin tunas (Thunnus maccoyii) (kg): General Free; Special none; Column 2 Free.
- 0301.99.03 Other (under: Other live fish): General Free; Special none; Column 2 Free.
- 0301.99.03.10 Tench (Tinca tinca), sheatfish (Silurus glanis) (kg).
- 0301.99.03.15 Bighead carp (Aristichthys nobilis) (kg).
- 0301.99.03.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.