HTS Heading 0304

Fish fillets and other fish meat (whether or not minced), fresh, chilled or frozen

All 166 HTS codes under heading 0304 (fish fillets and other fish meat), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.

Every line of heading 0304

  • 0304 Fish fillets and other fish meat (whether or not minced), fresh, chilled or frozen.
  • 0304.31.00.00 Tilapias (Oreochromis spp.) (under: Fresh or chilled fillets of tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.32.00 Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.32.00.10 Ictalurus spp. (under: Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.)) (kg).
  • 0304.32.00.20 Pangasius spp. including basa and tra (kg).
  • 0304.32.00.90 Other (under: Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.)) (kg).
  • 0304.33.00.00 Nile perch (Lates niloticus) (under: Fresh or chilled fillets of tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.39.00.00 Other (under: Fresh or chilled fillets of tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.41.00 Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus) Atlantic Salmon (Salmo salar) and Danube salmon (Hucho hucho): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.41.00.10 Farmed (under: Atlantic Salmon (Salmo salar)) (kg).
  • 0304.41.00.20 Not Farmed (under: Atlantic Salmon (Salmo salar)) (kg).
  • 0304.41.00.90 Other (under: Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus) Atlantic Salmon (Salmo salar) and Danube salmon (Hucho hucho)) (kg).
  • 0304.42.00.00 Trout (Salmo trutta, Oncorhynchus mykiss, Oncorhynchus clarki, Oncorhynchus aguabonita, Oncorhynchus gilae Oncorhynchus apache, and Oncorhynchus chrysogaster) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.43.00 Flat Fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.43.00.10 Sole (under: Flat Fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae)) (kg).
  • 0304.43.00.15 Paice (under: Flat Fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae)) (kg).
  • 0304.43.00.20 Flounder (under: Flat Fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae)) (kg).
  • 0304.43.00.25 Greenland turbot (Greenland halibut), (Reinhardtius hippoglossoides) (kg).
  • 0304.43.00.90 Other (under: Flat Fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae)) (kg).
  • 0304.44.00 Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae: General Free; Special none; Column 2 5.5¢/kg.
  • 0304.44.00.10 Atlantic Cod (under: Cod) (kg).
  • 0304.44.00.15 Other (under: Cod) (kg).
  • 0304.44.00.20 Haddock (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.44.00.25 Pollock (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.44.00.30 Hake (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.44.00.90 Other (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.45.00.00 Swordfish (Xiphias gladius) (under: Fresh or chilled fillets of other fish) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.46.00.00 Toothfish (Dissostichus spp.) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.47.00.00 Dogfish and other sharks (under: Fresh or chilled fillets of other fish) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.48.00.00 Rays and skates (Rajidae) (under: Fresh or chilled fillets of other fish) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.49.01 Other (under: Fresh or chilled fillets of other fish): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.49.01.03 Pike (under: Fresh-water fish) (kg).
  • 0304.49.01.06 Pickerel (under: Fresh-water fish) (kg).
  • 0304.49.01.09 Whitefish (under: Fresh-water fish) (kg).
  • 0304.49.01.12 Tilapia, other than Oreochromis spp. (kg).
  • 0304.49.01.15 Other (under: Fresh-water fish) (kg).
  • 0304.49.01.20 Atlantic ocean perch (under: Other) (kg).
  • 0304.49.01.25 Cusk (under: Other) (kg).
  • 0304.49.01.90 Other (under: Other) (kg).
  • 0304.51.01 Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.51.01.10 Ictalurus spp. (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg).
  • 0304.51.01.15 Pangasius spp., including basa and tra (kg).
  • 0304.51.01.20 Nile Perch (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg).
  • 0304.51.01.25 Tilapias (Oreochromis spp.) (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg).
  • 0304.51.01.90 Other (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg).
  • 0304.52.00 Salmonidae (under: Other, fresh or chilled): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.52.00.10 Farmed (under: Atlantic salmon (Salmo salar)) (kg).
  • 0304.52.00.15 Not farmed (under: Atlantic salmon (Salmo salar)) (kg).
  • 0304.52.00.20 Other salmon (under: Salmonidae) (kg).
  • 0304.52.00.90 Other (under: Salmonidae) (kg).
  • 0304.53.00 Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae: General Free; Special none; Column 2 5.5¢/kg.
  • 0304.53.00.10 Atlantic Cod (under: Cod) (kg).
  • 0304.53.00.15 Other (under: Cod) (kg).
  • 0304.53.00.20 Haddock (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.53.00.25 Pollock (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.53.00.30 Hake (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.53.00.90 Other (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae) (kg).
  • 0304.54.00.00 Swordfish (Xiphias gladius) (under: Other, fresh or chilled) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.55.00.00 Toothfish (Dissostichus spp.) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.56.00.00 Dogfish and other sharks (under: Other, fresh or chilled) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.57.00.00 Rays and skates (Rajidae) (under: Other, fresh or chilled) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.59.00 Other (under: Other, fresh or chilled): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.59.00.03 Yellow perch (under: Perch) (kg).
  • 0304.59.00.06 Pike perch (including yellow pike) (kg).
  • 0304.59.00.09 Other (under: Perch) (kg).
  • 0304.59.00.15 Pike (under: Fresh-water fish) (kg).
  • 0304.59.00.20 Pickerel (under: Fresh-water fish) (kg).
  • 0304.59.00.25 Whitefish (under: Fresh-water fish) (kg).
  • 0304.59.00.30 Tilapia other than Oreochromis spp. (kg).
  • 0304.59.00.36 Other (under: Fresh-water fish) (kg).
  • 0304.59.00.40 Sole (under: Flat Fish) (kg).
  • 0304.59.00.45 Plaice (under: Flat Fish) (kg).
  • 0304.59.00.50 Flounder (under: Flat Fish) (kg).
  • 0304.59.00.55 Greenland turbot (Greenland halibut), (Reinhardtius hippoglossoides) (kg).
  • 0304.59.00.61 Other (under: Flat Fish) (kg).
  • 0304.59.00.65 Atlantic ocean perch (under: Other) (kg).
  • 0304.59.00.70 Cusk (under: Other) (kg).
  • 0304.59.00.91 Other (under: Other) (kg).
  • 0304.61.00.00 Tilapias (Oreochromis spp.) (under: Frozen fillets of tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbushoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.62.00 Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.62.00.10 Ictalurus spp. (under: Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.)) (kg).
  • 0304.62.00.20 Pangasius spp. (including basa and tra) (kg).
  • 0304.62.00.30 Other Siluriformes (under: Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.)) (kg).
  • 0304.62.00.90 Other (under: Catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.)) (kg).
  • 0304.63.00.00 Nile perch (Lates niloticus) (under: Frozen fillets of tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbushoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.69.00.00 Other (under: Frozen fillets of tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbushoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.71 Cod (Gadus morhua, Gadus ogac,Gadus macrocephalus).
  • 0304.71.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.71.50.00 Other (under: Cod (Gadus morhua, Gadus ogac,Gadus macrocephalus)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.72 Haddock (Melanogrammus aeglefinus).
  • 0304.72.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.72.50.00 Other (under: Haddock (Melanogrammus aeglefinus)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.73 Coalfish (Pollachius virens) (under: Frozen fillets of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae).
  • 0304.73.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.73.50.00 Other (under: Coalfish (Pollachius virens)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.74 Hake (Merluccius spp., Urophycis spp.).
  • 0304.74.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.74.50.00 Other (under: Hake (Merluccius spp., Urophycis spp.)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.75 Alaska pollock (Theragra chalcogramma).
  • 0304.75.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.75.50.00 Other (under: Alaska pollock (Theragra chalcogramma)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.79 Other (under: Frozen fillets of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae).
  • 0304.79.10 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.79.10.10 Pollock other than Alaska pollock (kg).
  • 0304.79.10.15 Whiting (Merluccius spp.) (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.79.10.90 Other (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.79.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.81 Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus) Atlantic Salmon (Salmo salar) and Danube salmon (Hucho hucho).
  • 0304.81.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.81.50 Other (under: Pacific salmon (Oncorhynchus nerka, Oncorhynchus gorbuscha, Oncorhynchus keta, Oncorhynchus tschawytscha, Oncorhynchus kisutch, Oncorhynchus masou and Oncorhynchus rhodurus) Atlantic Salmon (Salmo salar) and Danube salmon (Hucho hucho)): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.81.50.10 Atlantic salmon (Salmo salar) (kg).
  • 0304.81.50.90 Other (under: Other) (kg).
  • 0304.82 Trout (Salmo trutta, Oncorhynchus mykiss, Oncorhynchus clarki, Oncorhynchus aguabonita, Oncorhynchus gilae Oncorhynchus apache and Oncorhynchus chrysogaster).
  • 0304.82.10.00 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.82.50.00 Other (under: Trout (Salmo trutta, Oncorhynchus mykiss, Oncorhynchus clarki, Oncorhynchus aguabonita, Oncorhynchus gilae Oncorhynchus apache and Oncorhynchus chrysogaster)) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.83 Flat fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae).
  • 0304.83.10 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.83.10.10 Greenland turbot (Greenland halibut) (Reinhardtius hippoglossoides) (kg).
  • 0304.83.10.15 Sole (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.83.10.20 Flounder (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.83.10.25 Halibut (under: Other) (kg).
  • 0304.83.10.30 Turbot (under: Other) (kg).
  • 0304.83.10.90 Other (under: Other) (kg).
  • 0304.83.50 Other (under: Flat fish (Pleuronectidae, Bothidae, Cynoglossidae, Soleidae, Scophthalmidae, and Citharidae)): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.83.50.10 Greenland turbot (Greenland halibut) (Reinhardtius hippoglossoides) (kg).
  • 0304.83.50.15 Sole (under: Other) (kg).
  • 0304.83.50.20 Flounder (under: Other) (kg).
  • 0304.83.50.25 Halibut (under: Other) (kg).
  • 0304.83.50.30 Turbot (under: Other) (kg).
  • 0304.83.50.90 Other (under: Other) (kg).
  • 0304.84.00.00 Swordfish (Xiphias gladius) (under: Frozen fillets of other fish) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.85.00.00 Toothfish (Dissostichus spp.) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.86.00.00 Herrings (Clupea harengus, Clupea pallasii) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.87.00.00 Tunas (of the genus Thunnus), skipjack tuna (stripe-bellied bonito) (Katsuwonus pelamis) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.88.00.00 Dogfish, other sharks, rays and skates (Rajidae) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.89 Other (under: Frozen fillets of other fish).
  • 0304.89.10 Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.89.10.10 Ocean catfish (wolf fish) (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.89.10.15 Pickerel (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.89.10.20 Sauger (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.89.10.25 Atlantic ocean perch (under: Perch) (kg).
  • 0304.89.10.30 Other ocean perch (under: Perch) (kg).
  • 0304.89.10.35 Other (under: Perch) (kg).
  • 0304.89.10.90 Other (under: Skinned, whether or not divided into pieces, and frozen into blocks each weighing over 4.5 kg, imported to be minced, ground or cut into pieces of uniform weights and dimensions) (kg).
  • 0304.89.50 Other (under: Other): General Free; Special none; Column 2 5.5¢/kg.
  • 0304.89.50.03 Yellow perch (under: Perch) (kg).
  • 0304.89.50.06 Pike perch (including yellow pike) (kg).
  • 0304.89.50.09 Other (under: Perch) (kg).
  • 0304.89.50.15 Pickerel (under: Fresh-water fish) (kg).
  • 0304.89.50.20 Pike (under: Fresh-water fish) (kg).
  • 0304.89.50.25 Sauger (under: Fresh-water fish) (kg).
  • 0304.89.50.30 Other (under: Fresh-water fish) (kg).
  • 0304.89.50.35 Atlantic ocean perch (under: Other) (kg).
  • 0304.89.50.40 Other ocean perch (under: Other) (kg).
  • 0304.89.50.45 Ocean catfish (wolf fish) (under: Other) (kg).
  • 0304.89.50.50 Orange roughy (Hoplostethus atlanticus) (kg).
  • 0304.89.50.55 Dolphin (Mahi mahi) (Coryphaena spp.) (kg).
  • 0304.89.50.60 Cusk (under: Other) (kg).
  • 0304.89.50.91 Other (under: Other) (kg).
  • 0304.91 Swordfish (Xiphias gladius) (under: Other, frozen).
  • 0304.91.10.00 In bulk or in immediate containers weighing with their contents over 6.8 kg each (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.91.90.00 Other (under: Swordfish (Xiphias gladius)) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.92 Toothfish (Dissostichus spp.).
  • 0304.92.10.00 In bulk or in immediate containers weighing with their contents over 6.8 kg each (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0304.92.90.00 Other (under: Toothfish (Dissostichus spp.)) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.93 Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.).
  • 0304.93.10 In bulk or in immediate containers weighing with their contents over 6.8 kg each: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.93.10.05 Surimi (under: Minced) (kg).
  • 0304.93.10.10 Other (under: Minced) (kg).
  • 0304.93.10.90 Other (under: In bulk or in immediate containers weighing with their contents over 6.8 kg each) (kg).
  • 0304.93.90.00 Other (under: Tilapias (Oreochromis spp.), catfish (Pangasius spp., Silurus spp., Clarias spp., Ictalurus spp.), carp (Cyprinus spp., Carassius spp., Ctenopharyngodon idellus, Hypophthalmichthys spp., Cirrhinus spp., Mylopharyngodon piceus, Catla catla, Labeo spp., Osteochilus hasselti, Leptobarbus hoeveni, Megalobrama spp.), eels (Anguilla spp.), Nile perch (Lates niloticus) and snakeheads (Channa spp.)) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.94 Alaska pollock (Theragra chalcogramma).
  • 0304.94.10 In bulk or in immediate containers weighing with their contents over 6.8 kg each: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.94.10.05 Surimi (under: Minced) (kg).
  • 0304.94.10.10 Other (under: Minced) (kg).
  • 0304.94.10.90 Other (under: In bulk or in immediate containers weighing with their contents over 6.8 kg each) (kg).
  • 0304.94.90.00 Other (under: Alaska pollock (Theragra chalcogramma)) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.95 Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae, other than Alaska Pollock (Theragra chalcogramma).
  • 0304.95.10 In bulk or in immediate containers weighing with their contents over 6.8 kg each: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.95.10.05 Surimi (under: Minced) (kg).
  • 0304.95.10.10 Cod (under: Other) (kg).
  • 0304.95.10.15 Other (under: Other) (kg).
  • 0304.95.10.20 Cod (under: Other) (kg).
  • 0304.95.10.25 Haddock (under: Other) (kg).
  • 0304.95.10.30 Pollock (under: Other) (kg).
  • 0304.95.10.90 Other (under: Other) (kg).
  • 0304.95.90.00 Other (under: Fish of the families Bregmacerotidae, Euclichthyidae, Gadidae, Macrouridae, Melanonidae, Merlucciidae, Moridae and Muraenolepididae, other than Alaska Pollock (Theragra chalcogramma)) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.96.00.00 Dogfish and other sharks (under: Other, frozen) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.97.00.00 Rays and skates (Rajidae) (under: Other, frozen) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.99 Other (under: Other, frozen).
  • 0304.99.11 In bulk or in immediate containers weighing with their contents over 6.8 kg each: General Free; Special none; Column 2 2.8¢/kg.
  • 0304.99.11.04 Surimi (under: Minced) (kg).
  • 0304.99.11.09 Other (under: Minced) (kg).
  • 0304.99.11.50 Sole (under: Other) (kg).
  • 0304.99.11.60 Greenland turbot (Greenland halibut) (Reinhardtius hippoglossoides) (kg).
  • 0304.99.11.70 Ocean perch (under: Other) (kg).
  • 0304.99.11.82 Pike (under: Other) (kg).
  • 0304.99.11.83 Whitefish (under: Other) (kg).
  • 0304.99.11.84 Fresh-water (under: Other) (kg).
  • 0304.99.11.90 Tuna [of genus Thunnus and of fish of the genus Euthynnus(Katsuwonus) pelamis] (kg).
  • 0304.99.11.94 Other (under: Other) (kg).
  • 0304.99.91 Other (under: Other): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0304.99.91.90 Ocean (under: Other) (kg).
  • 0304.99.91.92 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.