HTS Heading 0308
Aquatic invertebrates other than crustaceans and molluscs, live, fresh, chilled, frozen, dried, salted or in brine; smoked aquatic invertebrates other than crustaceans and molluscs, whether or not cooked before or during the smoking process
All 9 HTS codes under heading 0308 (aquatic invertebrates), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0308
- 0308 Aquatic invertebrates other than crustaceans and molluscs, live, fresh, chilled, frozen, dried, salted or in brine; smoked aquatic invertebrates other than crustaceans and molluscs, whether or not cooked before or during the smoking process.
- 0308.11.00.00 Live, fresh or chilled (under: Sea cucumbers (Stichopus japonicus, Holothuroidea)) (kg): General Free; Special none; Column 2 Free.
- 0308.12.00.00 Frozen (under: Sea cucumbers (Stichopus japonicus, Holothuroidea)) (kg): General Free; Special none; Column 2 Free.
- 0308.19.01.00 Other (under: Sea cucumbers (Stichopus japonicus, Holothuroidea)) (kg): General Free; Special none; Column 2 Free.
- 0308.21.00 Live, fresh or chilled (under: Sea urchins (Strongylocentrotus spp., Paracentrotus lividus, Loxechinus albus, Echinus esculentus)): General Free; Special none; Column 2 Free.
- 0308.21.00.21 Roe (under: Live, fresh or chilled) (kg).
- 0308.21.00.29 Other (under: Live, fresh or chilled) (kg).
- 0308.22.00.00 Frozen (under: Sea urchins (Strongylocentrotus spp., Paracentrotus lividus, Loxechinus albus, Echinus esculentus)) (kg): General Free; Special none; Column 2 Free.
- 0308.29.01.00 Other (under: Sea urchins (Strongylocentrotus spp., Paracentrotus lividus, Loxechinus albus, Echinus esculentus)) (kg): General Free; Special none; Column 2 Free.
- 0308.30.00.00 Jellyfish (Rhopilema spp.) (under: Aquatic invertebrates other than crustaceans and molluscs, live, fresh, chilled, frozen, dried, salted or in brine; smoked aquatic invertebrates other than crustaceans and molluscs, whether or not cooked before or during the smoking process) (kg): General Free; Special none; Column 2 Free.
- 0308.90.01.00 Other (under: Aquatic invertebrates other than crustaceans and molluscs, live, fresh, chilled, frozen, dried, salted or in brine; smoked aquatic invertebrates other than crustaceans and molluscs, whether or not cooked before or during the smoking process) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.