HTS Heading 0309

Flours, meals and pellets of fish, crustaceans, molluscs and other aquatic invertebrates, fit for human consumption

All 13 HTS codes under heading 0309 (flours, meals and pellets of fish), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.

Every line of heading 0309

  • 0309 Flours, meals and pellets of fish, crustaceans, molluscs and other aquatic invertebrates, fit for human consumption.
  • 0309.10 Of fish (under: Flours, meals and pellets of fish, crustaceans, molluscs and other aquatic invertebrates, fit for human consumption).
  • 0309.10.05.00 In bulk or in immediate containers weighing with their contents over 6.8 kg each (kg): General Free; Special none; Column 2 2.8¢/kg.
  • 0309.10.90.00 Other (under: Of fish) (kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 0309.90 Other (under: Flours, meals and pellets of fish, crustaceans, molluscs and other aquatic invertebrates, fit for human consumption).
  • 0309.90.10 Frozen (under: Of crustaceans): General Free; Special none; Column 2 Free.
  • 0309.90.10.10 Freshwater crawfish (under: Frozen) (kg).
  • 0309.90.10.30 Antarctic krill (under: Frozen) (kg).
  • 0309.90.10.61 Other (under: Frozen) (kg).
  • 0309.90.20.00 Live, fresh, or chilled (under: Of crustaceans) (kg): General Free; Special none; Column 2 Free.
  • 0309.90.30.00 Other (under: Of crustaceans) (kg): General Free; Special none; Column 2 Free.
  • 0309.90.40 Live, fresh or chilled (under: Of molluscs): General Free; Special none; Column 2 Free.
  • 0309.90.40.30 Conch (under: Live, fresh or chilled) (kg).
  • 0309.90.40.90 Other (under: Live, fresh or chilled) (kg).
  • 0309.90.50 Frozen (under: Of molluscs): General Free; Special none; Column 2 Free.
  • 0309.90.50.30 Conch (under: Frozen) (kg).
  • 0309.90.50.90 Other (under: Frozen) (kg).
  • 0309.90.60.00 Other (under: Of molluscs) (kg): General Free; Special none; Column 2 Free.
  • 0309.90.90.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.