HTS Heading 0708
Leguminous vegetables, shelled or unshelled, fresh or chilled
All 18 HTS codes under heading 0708 (leguminous vegetables), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0708
- 0708 Leguminous vegetables, shelled or unshelled, fresh or chilled.
- 0708.10 Peas (Pisum sativum) (under: Leguminous vegetables, shelled or unshelled, fresh or chilled).
- 0708.10.20 If entered during the period from July 1 to September 30, inclusive, in any year: General 0.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.6¢/kg.
- 0708.10.20.20 Snow peas (under: If entered during the period from July 1 to September 30, inclusive, in any year) (kg).
- 0708.10.20.40 Sugar snap peas (under: If entered during the period from July 1 to September 30, inclusive, in any year) (kg).
- 0708.10.20.60 Other (under: If entered during the period from July 1 to September 30, inclusive, in any year) (kg).
- 0708.10.40 Other (under: Peas (Pisum sativum)): General 2.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.6¢/kg.
- 0708.10.40.20 Snow peas (under: Other) (kg).
- 0708.10.40.40 Sugar snap peas (under: Other) (kg).
- 0708.10.40.60 Other (under: Other) (kg).
- 0708.20 Beans (Vigna spp., Phaseolus spp.).
- 0708.20.10.00 Lima beans, if entered during the period from November 1 in any year to the following May 31, inclusive (kg): General 2.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.7¢/kg.
- 0708.20.20 Cowpeas (other than black-eye peas): General Free; Special none; Column 2 Free.
- 0708.20.20.05 Yard-long beans (Vigna unguiculata subsp., Sesquipedalis) (kg).
- 0708.20.20.10 Other (under: Cowpeas (other than black-eye peas)) (kg).
- 0708.20.90 Other (under: Beans (Vigna spp., Phaseolus spp.)): General 4.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.7¢/kg.
- 0708.20.90.05 Other beans of the genusVigna (kg).
- 0708.20.90.20 French style (under: Other) (kg).
- 0708.20.90.40 Certified organic (under: Other) (kg).
- 0708.20.90.60 Other (under: Other) (kg).
- 0708.90 Other leguminous vegetables (under: Leguminous vegetables, shelled or unshelled, fresh or chilled).
- 0708.90.05.00 Chickpeas (garbanzos) (under: Other leguminous vegetables) (kg): General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 4.4¢/kg.
- 0708.90.15.00 Lentils (under: Other leguminous vegetables) (kg): General 0.1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.1¢/kg.
- 0708.90.25.00 If entered during the period from July 1 to September 30, inclusive, in any year (kg): General Free; Special none; Column 2 8.6¢/kg.
- 0708.90.30.00 Other (under: Pigeon peas) (kg): General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.6¢/kg.
- 0708.90.40.00 Other (under: Other leguminous vegetables) (kg): General 4.9¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.7¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.