HTS Heading 0713

Dried leguminous vegetables, shelled, whether or not skinned or split

All 62 HTS codes under heading 0713 (dried leguminous), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0713

  • 0713 Dried leguminous vegetables, shelled, whether or not skinned or split.
  • 0713.10 Peas (Pisum sativum) (under: Dried leguminous vegetables, shelled, whether or not skinned or split).
  • 0713.10.10.00 Seeds of a kind used for sowing (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.10.20.00 Split peas (under: Other) (kg): General Free; Special none; Column 2 5.5¢/kg.
  • 0713.10.40 Other (under: Other): General 0.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.9¢/kg.
  • 0713.10.40.05 Certified Organic (under: Yellow peas) (kg).
  • 0713.10.40.15 Other (under: Yellow peas) (kg).
  • 0713.10.40.20 Green peas (under: Other) (kg).
  • 0713.10.40.60 Austrian winter peas (under: Other) (kg).
  • 0713.10.40.80 Other (under: Other) (kg).
  • 0713.20 Chickpeas (garbanzos) (under: Dried leguminous vegetables, shelled, whether or not skinned or split).
  • 0713.20.10.00 Seeds of a kind used for sowing (kg): General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.20.20 Other (under: Chickpeas (garbanzos)): General 1.4¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3.9¢/kg.
  • 0713.20.20.15 Certified organic (under: Other) (kg).
  • 0713.20.20.25 Kabuli chickpeas (under: Other) (kg).
  • 0713.20.20.75 Other (under: Other) (kg).
  • 0713.31 Beans of the species Vigna mungo (L.) Hepper or Vigna radiata (L.)Wilczek.
  • 0713.31.10.00 Seeds of a kind used for sowing (kg): General 0.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.31.20.00 If entered for consumption during the period from May 1 to August 31, inclusive, in any year (kg): General Free; Special none; Column 2 6.6¢/kg.
  • 0713.31.40.00 If entered for consumption outside the above stated period, or if withdrawn for consumption at any time (kg): General 0.3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.32 Small red (adzuki) beans (Phaseolus or Vigna angularis).
  • 0713.32.10.00 Seeds of a kind used for sowing (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.32.20.00 Other (under: Small red (adzuki) beans (Phaseolus or Vigna angularis)) (kg): General 1.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.33 Kidney beans, including white pea beans (Phaseolus vulgaris).
  • 0713.33.10 Seeds of a kind used for sowing: General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.33.10.20 Navy or pea beans (under: Seeds of a kind used for sowing) (kg).
  • 0713.33.10.40 Other (under: Seeds of a kind used for sowing) (kg).
  • 0713.33.20 If entered for consumption during the period from May 1 to August 31, inclusive, in any year: General 1¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.33.20.20 Navy or pea beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.33.20.30 Dark red beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.33.20.50 Light red beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.33.20.90 Other (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.33.40 If entered for consumption outside the above stated period, or if withdrawn for consumption at any time: General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.33.40.20 Navy or pea beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.33.40.30 Dark red beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.33.40.50 Light red beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.33.40.90 Other (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.34 Bambara beans (Vigna subterranea orVoandzeia subterranea).
  • 0713.34.10.00 Of a kind used for sowing (under: Bambara beans (Vigna subterranea orVoandzeia subterranea)) (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.34.20.00 If entered for consumption during the period from May 1 to August 31, Inclusive, in any year (kg): General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.34.40.00 If entered for consumption outside the above stated period, or if withdrawn for consumption at any time (kg): General 0.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.35.00.00 Cowpeas (Vigna unguiculata) (under: Beans (Vigna spp., Phaseolus spp.)) (kg): General Free; Special none; Column 2 6.6¢/kg.
  • 0713.39 Other (under: Beans (Vigna spp., Phaseolus spp.)).
  • 0713.39.11 Seeds of a kind used for sowing: General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.39.11.10 Cranberry beans (under: Seeds of a kind used for sowing) (kg).
  • 0713.39.11.90 Other (under: Seeds of a kind used for sowing) (kg).
  • 0713.39.21 If entered for consumption during the period from May 1 to August 31, inclusive, in any year: General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.39.21.10 Black beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.21.20 Great Northern beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.21.30 Baby lima beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.21.40 Other lima beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.21.50 Pinto beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.21.60 Other white beans (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.21.70 Other (under: If entered for consumption during the period from May 1 to August 31, inclusive, in any year) (kg).
  • 0713.39.41 If entered for consumption outside the above stated period, or if withdrawn for consumption at any time: General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.39.41.10 Black beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.39.41.20 Great Northern beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.39.41.30 Baby lima beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.39.41.40 Other lima beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.39.41.50 Pinto beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.39.41.60 Other white beans (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.39.41.70 Other (under: If entered for consumption outside the above stated period, or if withdrawn for consumption at any time) (kg).
  • 0713.40 Lentils (under: Dried leguminous vegetables, shelled, whether or not skinned or split).
  • 0713.40.10.00 Seeds of a kind used for sowing (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.40.20 Other (under: Lentils): General 0.15¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.1¢/kg.
  • 0713.40.20.15 Certified organic (under: Green lentils, including French green (dark speckled)) (kg).
  • 0713.40.20.20 Other (under: Green lentils, including French green (dark speckled)) (kg).
  • 0713.40.20.35 Certified organic (under: Red) (kg).
  • 0713.40.20.50 Other (under: Red) (kg).
  • 0713.40.20.65 Certified organic (under: Other) (kg).
  • 0713.40.20.85 Other (under: Other) (kg).
  • 0713.50 Broad beans (Vicia faba var. major) and horse beans (Vicia faba var. equina and Vicia faba var. minor).
  • 0713.50.10.00 Seeds of a kind used for sowing (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.50.20.00 Other (under: Broad beans (Vicia faba var. major) and horse beans (Vicia faba var. equina and Vicia faba var. minor)) (kg): General 1.2¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.60 Pigeon peas (Cajanus cajan) (under: Dried leguminous vegetables, shelled, whether or not skinned or split).
  • 0713.60.10.00 Of a kind used for sowing (under: Pigeon peas (Cajanus cajan)) (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.60.60.00 If entered for consumption during the period from May 1 to August 31, inclusive, in any year (kg): General 0.8¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.60.80.00 If entered for consumption outside the above stated period, or if withdrawn for consumption at any time (kg): General 1.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.90 Other (under: Dried leguminous vegetables, shelled, whether or not skinned or split).
  • 0713.90.11.00 Seeds of a kind used for sowing (kg): General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.2¢/kg.
  • 0713.90.50.00 Guar seeds (under: Other) (kg): General Free; Special none; Column 2 Free.
  • 0713.90.61.00 If entered for consumption during the period from May 1 to August 31, inclusive, in any year (kg): General 0.8¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.
  • 0713.90.81.00 If entered for consumption outside the above stated period, or if withdrawn for consumption at any time (kg): General 1.5¢/kg; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.6¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.