HTS Heading 0809

Apricots, cherries, peaches (including nectarines), plums (including prune plums) and sloes, fresh

All 8 HTS codes under heading 0809 (apricots, cherries), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0809

  • 0809 Apricots, cherries, peaches (including nectarines), plums (including prune plums) and sloes, fresh.
  • 0809.10.00.00 Apricots (under: Apricots, cherries, peaches (including nectarines), plums (including prune plums) and sloes, fresh) (kg): General 0.2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.1¢/kg.
  • 0809.21.00.00 Sour cherries (Prunus cerasus) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 0809.29.00.00 Other (under: Cherries) (kg): General Free; Special none; Column 2 4.4¢/kg.
  • 0809.30 Peaches, including nectarines.
  • 0809.30.20.00 If entered during the period from June 1 to November 30, inclusive, in any year (kg): General 0.2¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.1¢/kg.
  • 0809.30.40 If entered at any other time (under: Peaches, including nectarines): General Free; Special none; Column 2 1.1¢/kg.
  • 0809.30.40.10 Peaches (under: If entered at any other time) (kg).
  • 0809.30.40.90 Nectarines (under: If entered at any other time) (kg).
  • 0809.40 Plums (including prune plums) and sloes.
  • 0809.40.20.00 If entered during the period from January 1 to May 31, inclusive, in any year (kg): General Free; Special none; Column 2 1.1¢/kg.
  • 0809.40.40.00 If entered at any other time (under: Plums (including prune plums) and sloes) (kg): General 0.5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.1¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.