HTS Chapter 8
Edible fruit and nuts; peel of citrus fruit or melons
The 14 headings and 240 HTS codes of chapter 8 (edible fruit and nuts), with their duty rates from the 2026 HTS Revision 23.
The 14 headings of chapter 8
- 0801: Coconuts, Brazil nuts and cashew nuts, fresh or dried, whether or not shelled or peeled (8 codes, General duty Free)
- 0802: Other nuts, fresh or dried, whether or not shelled or peeled (25 codes, General duty Free, some per unit)
- 0803: Bananas and plantains, fresh or dried (5 codes, General duty Free to 1.4%)
- 0804: Dates, figs, pineapples, avocados, guavas, mangoes and mangosteens, fresh or dried (27 codes, General duty Free to 29.8%, some per unit)
- 0805: Citrus fruit, fresh or dried (19 codes, General duty Free to 0.8%, some per unit)
- 0806: Grapes, fresh or dried (20 codes, General duty Free, some per unit)
- 0807: Melons (including watermelons) and papayas (papaws), fresh (19 codes, General duty 1.6% to 29.8%)
- 0808: Apples, pears and quinces, fresh (13 codes, General duty Free, some per unit)
- 0809: Apricots, cherries, peaches (including nectarines), plums (including prune plums) and sloes, fresh (8 codes, General duty Free, some per unit)
- 0810: Other fruit, fresh (38 codes, General duty Free to 2.2%, some per unit)
- 0811: Fruit and nuts, uncooked or cooked by steaming or boiling in water, frozen, whether or not containing added sugar or other sweetening matter (30 codes, General duty Free to 14.5%, some per unit)
- 0812: Fruit and nuts provisionally preserved, but unsuitable in that state for immediate consumption (7 codes, General duty Free to 11.2%, some per unit)
- 0813: Fruit, dried, other than that of headings 0801 to 0806; mixtures of nuts or dried fruits of this chapter (18 codes, General duty Free to 14%, some per unit)
- 0814: Peel of citrus fruit or melons (including watermelons), fresh, frozen, dried or provisionally preserved in brine, in sulfur water or in other preservative solutions (3 codes, General duty Free, some per unit)
Where it sits in the schedule
Chapter 8 is in Section II of the Harmonized System, vegetable products (chapters 6 to 14). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.