HTS Heading 0902

Tea, whether or not flavored

All 11 HTS codes under heading 0902 (tea, whether or not flavored), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%.

Every line of heading 0902

  • 0902 Tea, whether or not flavored.
  • 0902.10 Green tea (not fermented) in immediate packings of a content not exceeding 3 kg.
  • 0902.10.10 Flavored (under: Green tea (not fermented) in immediate packings of a content not exceeding 3 kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 20%.
  • 0902.10.10.15 Certified organic (under: Flavored) (kg).
  • 0902.10.10.50 Other (under: Flavored) (kg).
  • 0902.10.90 Other (under: Green tea (not fermented) in immediate packings of a content not exceeding 3 kg): General Free; Special none; Column 2 Free.
  • 0902.10.90.15 Certified organic (under: Other) (kg).
  • 0902.10.90.50 Other (under: Other) (kg).
  • 0902.20 Other green tea (not fermented).
  • 0902.20.10.00 Flavored (under: Other green tea (not fermented)) (kg): General 6.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.2% (JP); Column 2 20%.
  • 0902.20.90 Other (under: Other green tea (not fermented)): General Free; Special none; Column 2 Free.
  • 0902.20.90.15 Certified organic (under: Other) (kg).
  • 0902.20.90.50 Other (under: Other) (kg).
  • 0902.30.00 Black tea (fermented) and partly fermented tea, in immediate packings of a content not exceeding 3 kg: General Free; Special none; Column 2 Free.
  • 0902.30.00.15 Certified organic (under: In tea bags) (kg).
  • 0902.30.00.50 Other (under: In tea bags) (kg).
  • 0902.30.00.90 Other (under: Black tea (fermented) and partly fermented tea, in immediate packings of a content not exceeding 3 kg) (kg).
  • 0902.40.00.00 Other black tea (fermented) and other partly fermented tea (kg): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.