HTS Heading 0904
Pepper of the genus Piper; dried or crushed or ground fruits of the genus Capsicum (peppers) or of the genus Pimenta (e.g., allspice)
All 14 HTS codes under heading 0904 (pepper of the genus Piper), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0904
- 0904 Pepper of the genus Piper; dried or crushed or ground fruits of the genus Capsicum (peppers) or of the genus Pimenta (e.g., allspice).
- 0904.11.00 Neither crushed nor ground (under: Pepper of the genus Piper): General Free; Special none; Column 2 Free.
- 0904.11.00.20 Black (under: Neither crushed nor ground) (kg).
- 0904.11.00.40 White (under: Neither crushed nor ground) (kg).
- 0904.12.00.00 Crushed or ground (under: Pepper of the genus Piper) (kg): General Free; Special none; Column 2 2¢/kg.
- 0904.21 Dried, neither crushed nor ground.
- 0904.21.20.00 Paprika (under: Of the genusCapsicum(including cayenne pepper, paprika and red pepper)) (kg): General 3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0904.21.40.00 Anaheim and ancho pepper (under: Of the genusCapsicum(including cayenne pepper, paprika and red pepper)) (kg): General 5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0904.21.60 Other (under: Of the genusCapsicum(including cayenne pepper, paprika and red pepper)): General 2.5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0904.21.60.10 Bell peppers (under: Other) (kg).
- 0904.21.60.20 Jalapeno peppers (under: Other) (kg).
- 0904.21.60.90 Other (under: Other) (kg).
- 0904.21.80.00 Of the genus Pimenta (including allspice) (kg): General Free; Special none; Column 2 Free.
- 0904.22 Crushed or ground (under: Fruits of the genus Capsicum or of the genus Pimenta).
- 0904.22.20.00 Paprika (under: Of the genus Capsicum (including cayenne Pepper, paprika and red pepper)) (kg): General 3¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢/kg.
- 0904.22.40.00 Anaheim and ancho pepper (under: Of the genus Capsicum (including cayenne Pepper, paprika and red pepper)) (kg): General 5¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 11¢/kg.
- 0904.22.73.00 Mixtures of mashed or macerated hot red peppers and salt (kg): General Free; Special none; Column 2 17.6¢/kg.
- 0904.22.76.00 Other (under: Of the genus Capsicum (including cayenne Pepper, paprika and red pepper)) (kg): General 5¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17.6¢/kg.
- 0904.22.80.00 Of the genus Pimenta (including allspice) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.