HTS Heading 0906
Cinnamon and cinnamon-tree flowers
All 3 HTS codes under heading 0906 (cinnamon and cinnamon-tree flowers), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0906
- 0906 Cinnamon and cinnamon-tree flowers.
- 0906.11.00.00 Cinnamon (Cinnamomum zeylanicum Blume) (kg): General Free; Special none; Column 2 Free.
- 0906.19.00.00 Other (under: Neither crushed nor ground) (kg): General Free; Special none; Column 2 Free.
- 0906.20.00.00 Crushed or ground (under: Cinnamon and cinnamon-tree flowers) (kg): General Free; Special none; Column 2 11¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.