HTS Heading 1001

Wheat and meslin

All 20 HTS codes under heading 1001 (wheat and meslin), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.8%, some per unit.

Every line of heading 1001

  • 1001 Wheat and meslin.
  • 1001.11.00.00 Seed (under: Durum wheat) (kg): General 0.65¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.5¢/kg.
  • 1001.19.00 Other (under: Durum wheat): General 0.65¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.5¢/kg.
  • 1001.19.00.25 Certified Organic (under: Other) (kg).
  • 1001.19.00.51 Grade 1 (under: Other) (kg).
  • 1001.19.00.53 Grade 2 (under: Other) (kg).
  • 1001.19.00.69 Other (under: Other) (kg).
  • 1001.91.00.00 Seed (under: Other) (kg): General 2.8%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 10%.
  • 1001.99.00 Other (under: Other): General 0.35¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 1.5¢/kg.
  • 1001.99.00.05 Canadian western extra strong hard red spring (CWES/HRS) wheat (kg).
  • 1001.99.00.07 Red spring wheat (under: Certified organic) (kg).
  • 1001.99.00.09 Other (under: Certified organic) (kg).
  • 1001.99.00.10 Having a specified protein content not exceeding 12.9% by weight (kg).
  • 1001.99.00.17 Having a specified protein content exceeding 12.9% but not exceeding 13.9% by weight. (kg).
  • 1001.99.00.18 Having a specified protein content exceeding 13.9% by weight (kg).
  • 1001.99.00.27 Having a specified protein content not exceeding 12.9% by weight (kg).
  • 1001.99.00.30 Having a specified protein content exceeding 12.9% but not exceeding 13.9% by weight. (kg).
  • 1001.99.00.33 Having a specified protein content exceeding 13.9% by weight. (kg).
  • 1001.99.00.36 Other red spring wheat (under: Red spring wheat) (kg).
  • 1001.99.00.45 White winter wheat (under: Other) (kg).
  • 1001.99.00.55 "Canadian" western red winter wheat (kg).
  • 1001.99.00.65 Soft white spring wheat (under: Other) (kg).
  • 1001.99.00.97 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.